Presentation is loading. Please wait.

Presentation is loading. Please wait.

XBT measurements in the Southern Adriatic

Similar presentations


Presentation on theme: "XBT measurements in the Southern Adriatic"— Presentation transcript:

1 1.2.2. XBT measurements in the Southern Adriatic
Mira Morović, Vlado Dadić, Frano Matić, Branka Grbec, Stipe Muslim Institute of Oceanography and Fisheries, Split, Croatia

2

3 Dubrovnik-Bari route Transects December 2002

4 Results

5

6 Comparison of 2003 and 2006

7

8

9

10 Conclusions Obtained are high resolution temperature profiles, more stations than in 2003 The layers bellow 50m to the bottom at the west side have been as usually colder than the same layers at the east side. The conditions at the west side are caused by a flow of colder deep water from the north.. The warmer conditions on the east side of the south Adriatic transect are caused by the flow of LIW through the Otranto Strait. The waters of the south Adriatic transect in the year 2006 have been slightly colder than in the year 2003 which was, according to meteorological data an exceptional year, with especially warmer summer, but colder winter. Near real time observation can inprove oceanographic forecasting

11 Time table: Techno-El meteo station on the ferry MARCO POLO Meteo station received: April 15, 2006 Request to Jadrolinija for permission for mounting the station : April 22, 2006 Permission received: July 12, 2006. Mounting of the Techno-El meteo station: July 23, 2006 from 10 to 17h30’ Place: Port of Bari Mr Montani from Techno El comp.

12 Meteo station manual Meteo station assembling

13 Satellite modem Campbell CR1000 logger Voltage regulator Rechargable battery Main switch regulator

14 Globstar antenna Temperature & Pressure sensors Box with logger

15 Meteo-station components:
Campbell logger CR1000 with accumulator and power supplay Satellite modem Time interval: 10 seconds Sensors: Air temperature, Air humidity Air pressure

16 Data processing Data validation (the procedure developed in EACE project) 2. Data comparison with regular meteorological stations (Dubrovnik, Lastovo, Palagruza, Bari, etc.) Use of the standard procedure for processing of meteo parameters Processing and comparison of data values along the transect at the predefined interval

17 Reconstruction of ferry Marko Polo position:
Monday 20h – Tuesday 17h (Rijeka-Split (630h)-Dubrovnik route) Tuesday 23h – Wednesday 7h (Dubrovnik - Bari trensect) Wednesday 22h – Thursday 7 h (Bari – Dubrovnik transect) Thursday 20h – Friday 17h (Dubrovnik-Split (630h)-Rijeka route)

18 Air temperature daily mean course from the ship meteorological station and coastal meteorological stations. Air temperature from shipborn meteorological station and sea temperature from XBT measurements during the last XBT campaign in October.

19 Position of meteo-station on board:
QUESTIONS Position of meteo-station on board: Is it the most appropriate? (Shadow, albedo) Have we followed all the procedures for automatic meteo stations on board? Adjustment of measuring interval (10” now)

20 Missing components: Sensors: wind speed wind direction. GPS system for registration position of ferry Original Campbell comunication software Licence for GLOBSTAR communication (for receiving real / near-real time data)

21 PRELIMINARY RESULTS Data dowloaded from station for the period: September 4 – September 8 Bari-Dubrovnik Dubrovnik-Bari

22 Measuring values of AT,AP and AH
September 4, 23-24h


Download ppt "XBT measurements in the Southern Adriatic"

Similar presentations


Ads by Google