Presentation is loading. Please wait.

Presentation is loading. Please wait.

LEED NC Sustainable Site: Prerequisite 1 Construction Activity Pollution Prevention.

Similar presentations


Presentation on theme: "LEED NC Sustainable Site: Prerequisite 1 Construction Activity Pollution Prevention."— Presentation transcript:

1 LEED NC Sustainable Site: Prerequisite 1 Construction Activity Pollution Prevention

2 Intent To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation and airborne dust generation.

3 Requirements Create and implement an erosion and sedimentation control plan for all construction activities associated with the project.

4

5 Dry Weather Timing of Construction Mark Existing Trees Prevent Root Damage Preserve/ Transplant Preserve Existing Drainage Patterns Preservation of Existing Vegetation Prevent Mixing of Storm Water Drainage and Drainage through construction activity to minimize water pollution Staging Areas Topsoil shall be stripped to a depth of 200 mm Stockpiled to a height of 400 mm in designated areas Reapplied to Site Preservation of Top Soil

6 measures to stop the source of the spill
to contain the spill to dispose the contaminated material and hazardous wastes Spill Prevention and Control A temporary dam or basin at the lowest point of the site Sedimentation Basin Contour Trenching shall be used with seeding and planting in steep slope areas (slopes greater than 33 percent) Netting or anchoring shall be used to hold it in place Mulching Geo Grids


Download ppt "LEED NC Sustainable Site: Prerequisite 1 Construction Activity Pollution Prevention."

Similar presentations


Ads by Google