Download presentation
Presentation is loading. Please wait.
Published byBrandon Young Modified over 6 years ago
1
Date of download: 12/23/2017 Copyright © ASME. All rights reserved. From: Full-Scope Probabilistic Safety Assessment of Balakovo Unit 1 in Russia ASME J of Nuclear Rad Sci. 2016;3(1): doi: / Figure Legend: Contribution of initiating event to fuel-damage frequency at-power
2
Date of download: 12/23/2017 Copyright © ASME. All rights reserved. From: Full-Scope Probabilistic Safety Assessment of Balakovo Unit 1 in Russia ASME J of Nuclear Rad Sci. 2016;3(1): doi: / Figure Legend: Seismic hazard curve for the Balakovo site
3
Date of download: 12/23/2017 Copyright © ASME. All rights reserved. From: Full-Scope Probabilistic Safety Assessment of Balakovo Unit 1 in Russia ASME J of Nuclear Rad Sci. 2016;3(1): doi: / Figure Legend: Stages of the external hazard PSA
4
Date of download: 12/23/2017 Copyright © ASME. All rights reserved. From: Full-Scope Probabilistic Safety Assessment of Balakovo Unit 1 in Russia ASME J of Nuclear Rad Sci. 2016;3(1): doi: / Figure Legend: Contribution to the fuel-damage frequency from different categories of initiators
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.