Presentation is loading. Please wait.

Presentation is loading. Please wait.

Planning & Land Services Fee Changes for 2016

Similar presentations


Presentation on theme: "Planning & Land Services Fee Changes for 2016"— Presentation transcript:

1

2 Planning & Land Services Fee Changes for 2016
Melanie Halsan November 6, 2015

3 Fee History PALS Fiscal Policy (R ) Fees should cover 100% of:

4 Fees History: Fiscal Policy goals:
Fee increases should be considered carefully so as to not shock the current market. All necessary fee increases should be implemented in a phased manner when possible. Implement the fiscal policy over eight years beginning with the 2012 budget.

5 Where are we Now: 2012-2016 5th year of an 8 year program
2011 2012 2013 2014 2015 2016 Overall Cost Coverage 50% 60-65% 65-70% 70% 70-75% 72-76%

6 Fee Increase Overview:
2014 2015 2016 Building Permit Fees $132,771 $67,000 $0.00 Land Use -$60,000 $150,000 $125,000

7 Fee Overview No Increase in Building Permits Select Fees:
Process efficiencies 2 years of Fee increases Select Fees: Land Use – Up 15% Platting – Up 15% General Critical Area – Up 15% Residential/AG Critical Area – Up 10% Select increases in Site Development Fees

8 Single Family Residence: 3,776 sq. ft
Single Family Residence: 3,776 sq. ft. 3 bedroom 2 story SFR with attached garage and deck

9 Comparison of fee changes
Current Fee Proposed 2016 Fee Change Building Permit $2,936.07 No Change Pre-Approved Plan Check $880.82 Fire Plan Check Fee $87.21 No change Plumbing $105.00 Mechanical $50.00 Admin Design Standards Review $640.00 $200.00 - $440.00 Abbreviated Plan – Lot in Subdivision $610.00 $635.00 Totals $5,309.10 $4,894.10 - $415.00

10 6 Lot Short Plat

11 Comparison of Fee Change:
Application 2015 Fee Proposed 2016 Fee (total Costs) 2015 Fee at time of application Short Plat $4,140.00 $4,800.00 $2,400.00 Site Plan Review $2,000.00 $1,300.00 Wetlands analysis report $1,450.00 $1,660.00 With 450 LF of Road $2,970.00 $3,200.00 Road Deviation $1,000.00 Total $11,560.00 $11,960.00 $8,560.00 Results in an $67 increase per lot (4% total project)

12 Commercial Site Development

13 Comparison of fee change:
Application 2014 Fee Proposed 2016 Fee Change Engineered Abbreviated Plan $1,400.00 $1,600.00 $200.00 Drainage Control Plan (5,000-49,999 cubic yards) $2,700.00 0.00 Wetland Analysis Report $1,450.00 $1,660.00 $210.00 Class IV General Permit $900.00 $1,000.00 $100.00 Site Plan Review $2,300.00 $1,300.00 -$1,000.00 Total $8,850.00 $8,260.00 -$590.00 7% reduction

14 Temporary Use Fees 2015 2016 Change Temporary Use Permit $340.00
$200.00 Reduction $140.00 Temporary Event $2,500.00 $1,250.00 Reduction $1,250.00 Temporary Event Renewal $625.00 New Fee

15 Shoreline Fee Changes Setting the stage for the new Shoreline Regulations: Comparable or less than existing Shoreline Fees Phased Flat fee for SD’s New fee Administrative Conditional Use Permit

16 Existing Fee Proposed* Shoreline Substantial Development Ranged from $5,060 to $7,150 $4,200 Shoreline Exemption Range from $75 - $800 $200 or $400 Shoreline CP $5,600 $5,000 Shoreline Admin CP Shoreline Variance $4,800 * Effective when Title 18S becomes effective

17 Last, but not least Renaming of fees Elimination of some fees
Combining of some fees Small corrections to the fee Notes

18 Questions


Download ppt "Planning & Land Services Fee Changes for 2016"

Similar presentations


Ads by Google