Presentation is loading. Please wait.

Presentation is loading. Please wait.

RIR Co-ordination and Joint Statistics

Similar presentations


Presentation on theme: "RIR Co-ordination and Joint Statistics"— Presentation transcript:

1 RIR Co-ordination and Joint Statistics
IEPG, Yokohama, Japan Prepared By APNIC, ARIN, RIPE NCC July 2002 IEPG, Yokohama, Japan

2 Overview Joint Efforts Statistics Individual RIR Updates Questions
July 2002 IEPG, Yokohama, Japan

3 RIR Coordination New IPv6 policy implemented
July 1st RIPE, APNIC ARIN in the coming month Early registration transfer project Plan developed at engineering coordination meeting in Toronto Schedule of transfer to be published Staff exchange 2 staff from ARIN at APNIC More planned July 2002 IEPG, Yokohama, Japan

4 Outreach Objectives Activities Raise awareness
Promote industry self-regulation Activities Meetings and joint presentations Government representatives Industry groups IPv6 Forum Training Programs AfNOG & AfriNIC, May 2002 July 2002 IEPG, Yokohama, Japan

5 Emerging RIR Support Emerging RIRs LACNIC AfriNIC
Working with ARIN to transition registration services Public policy meeting in Mexico City – November 2002 AfriNIC RIPE NCC Memorandum of Understanding signed for training Outreach meeting 14 May 2002, Lome, Togo AGM 5-9 August 2002, Nairobi, Kenya July 2002 IEPG, Yokohama, Japan

6 ASO Support ASO Secretariat ASO AC Support General Assembly
ARIN in 2002 APNIC 2003 ASO AC Support Monthly teleconference meetings General Assembly Hosted by RIRs: APNIC 2002 To be hosted by ARIN in 2003 July 2002 IEPG, Yokohama, Japan

7 Open Policy Meetings APNIC (2 per year) ARIN (2 per year)
3 - 6 Sept Kita-Kyushu, Fukuoka, JP ARIN (2 per year) ARIN X, Oct 30-Nov 1, Eugene, Oregon, US Combined with NANOG 26, Oct 27-29 RIPE (3 per year) Sept RIPE 43 - Rhodes, GR July 2002 IEPG, Yokohama, Japan

8 RIR Statistics July 2002 IEPG, Yokohama, Japan

9 IANA Delegations IPv4 Address Space
ARIN APNIC RIPE NCC APNIC RIPE NCC Unallocated ARIN Other Orgs. (pre-RIR) (Multicast) July 2002 IEPG, Yokohama, Japan

10 IPv4 Allocations per RIR 2002 (Jan-Jun)
RIPE NCC APNIC ARIN (0.89 /8’s) July 2002 IEPG, Yokohama, Japan

11 IPv4 Allocations per RIR 1999-2002
2.25 2.05 1.71 1.50 1.51 1.29 .92 .92 .89 0.79 .52 .57 2.61 4.47 5.47 2.37 July 2002 IEPG, Yokohama, Japan

12 IPv4 Allocations by Country 2002 (Jan-Jun)
July 2002 IEPG, Yokohama, Japan

13 IANA ASN Delegations Pre-RIR APNIC ARIN Reserved RIPE NCC July 2002
IEPG, Yokohama, Japan

14 ASN Assignments per RIR 2002 (Jan-Jun)
APNIC RIPE NCC b ARIN July 2002 IEPG, Yokohama, Japan

15 ASN Assignments per RIR 1999-2002
2,901 2,635 1,685 1,284 1,170 1,051 768 519 531 486 322 190 2,775 4,590 4,450 1,737 July 2002 IEPG, Yokohama, Japan

16 IPv6 Allocations per RIR 1999-2002
RIPE NCC APNIC ARIN Total: 154 as of June 30, 2002 July 2002 IEPG, Yokohama, Japan

17 Total IPv6 Allocations per RIR 1999-2002
July 2002 IEPG, Yokohama, Japan

18 Total IPv6 Allocations by Country 2002
13 13 25 NL, BE, BR, CA, CN, CN CZ, DK, GR, HK, HU, IE LT, MY, NO, PT, SG, ES 22 39 July 2002 IEPG, Yokohama, Japan

19 RIR Specifics July 2002 IEPG, Yokohama, Japan

20 APNIC Whois DB v3 migration APIRR – ‘Asia Pacific IRR’
Planned for August 20th Currently in test phase at v3.whois.net APIRR – ‘Asia Pacific IRR’ Server at irr.apnic.net Migration to Whois DB v3 mid Dec 2002 Recent delegations from IANA IPv6: 2001:0C00::/23, May 2002 IPv4: /8, Jul 2002 New IPv6 policy 6 requests for /35->/32 4 new requests for /32’s July 2002 IEPG, Yokohama, Japan

21 Integrated Resource Management System
“MyAPNIC” Secured member service web interface (X.509) Integration of all APNIC systems Request tracking Whois database Accounting/Finance database Member and allocation database Prototype testing July 2002 IEPG, Yokohama, Japan

22 ARIN New database release in August 2002 LACNIC transition support
Beta testing underway Training underway throughout North America LACNIC transition support Transition timeline developed LACNIC staff receiving training from ARIN Final approval of LACNIC is likely to occur in November 2002 July 2002 IEPG, Yokohama, Japan

23 RIPE NCC IPv6 policy implementation (1 July) /42 from SURFNET
New IPv6 address block: 2001:0800::/23 7 new requests since 1July 2 allocations made 12 requests for /35 -> /32 since 1 July /42 from SURFNET For internal use New IPv4 policy documentation Annual Report 2001 – published July 2002 IEPG, Yokohama, Japan

24 RIPE NCC Secure member service web portal RIPE NCC Member Survey
First public version launch at RIPE 43 Member access to private data: allocation history, view and change contact information RIPE NCC Member Survey Will be conducted Sept – Nov 2002 by independent organisation Routing Information Service (RIS) First US presence at MAE-West July 2002 IEPG, Yokohama, Japan

25 RIPE NCC Database developments: security area
New MD5-PW authentication scheme MAIL-FROM auth has been phased out IRT object representing CSIRT Database developments: routing registry RRCC full prototype is available at: IRRToolSet support, look at: Database - future plans Interactive updates (prototype is ready) User friendly web interface for updates Improved error reporting in acknowledgements July 2002 IEPG, Yokohama, Japan

26 Thank You July 2002 IEPG, Yokohama, Japan


Download ppt "RIR Co-ordination and Joint Statistics"

Similar presentations


Ads by Google