1 CLAS12 - CT meeting 10 October 2013
Elec boxe µm tube HV dispatch Barrel B6 flange barrel forward

2 CLAS12 micromegas tracker news.
New planning Delivery mid 2015 of B2 (two layers) and forward Delivery mid 2016 of B6 (6 layers). The µm tube + electronics are the same from B2 to B6 (compatible with Si4) Only the barrel flange change when going from B2 to B6. Forward stays the same. All detectors (barrel and forward) will be equipped with resistive technologies using serigraphy process. All detectors will be manufacture at CERN.

3 3D study Since June the forward vs keepin was reduced: 35 mm were gain on the 40 mm needed Smaller attachment to barrel More dense stack of disk. Still missing 5.25 mm vs HTCC

4 Physics angle The angle of the forward are: 8,38° to 28,36°

5 µm tube At the rear of the tube: OK for: To be checked
Electronics boxes Optical concentrator removed (on cart) HV and gas distribution: between boxes To be checked Last tube step (mandatory step ?) Tube length with flange Attachment of the flange (space needed for tooling)

6 Rear of µm tube Attachment access needed? Step needed ?

7 Coming soon Alignment process and attachment of tubes
We need iteration before next meeting in JAB Geometer target, procedure, tooling,… Date of next meeting at Jlab Between mid December 2013 and end January 2014 Goal (for Saclay): Final design review for micromegas tracker Geen light for detail drawing and realization Validation of attachment of µm tube work on definition of servitude in situ (gas hardware and safety, electronics rack,…) …/…