Presentation is loading. Please wait.

Presentation is loading. Please wait.

IMPLEMENTING JOB OF BUILDING FINISHING

Similar presentations


Presentation on theme: "IMPLEMENTING JOB OF BUILDING FINISHING"— Presentation transcript:

1 IMPLEMENTING JOB OF BUILDING FINISHING
Doing stone foundation Job By : SMK Negeri 5 Surakarta

2 GOALS OF LEARNING : Student can identify river stone foundation arrangement. Student can explain kinds of river stone foundation construction. Student can make arrangement profile of river Stone Foundation. Student can do river stone foundation arrangement. Teknologi dan Rekayasa

3 REQUIRES OF RIVER STONE FOUNDATION ARRANGEMENT
Kind of Foundation determining is influenced by kinds of land. After Kinds of Foundation is determined so Before making calculation , we have to observe kinds of land. (Kind of Land, land supporting ,Land water condition) In digging the hole of foundation , It has to reach hard land. It is used split stone from mountain. Teknologi dan Rekayasa

4 INSTALLING FOUNDATION STAGE
Prepare all material which is needed. Checking Foundation Profile according to the regulation in Picture. The height of foundation installing may not exceed 50 CM in every day. After finishing Foundation , the remeasuring the digging line has soonly carried out. Teknologi dan Rekayasa

5 INSTALLING PLAN OF PROFILE AND BOUPLANK

6 FOUNDATION ARRANGEMENT

7 FOUNDATION ARRANGEMENT


Download ppt "IMPLEMENTING JOB OF BUILDING FINISHING"

Similar presentations


Ads by Google