Presentation is loading. Please wait.

Presentation is loading. Please wait.

NCR FastLane Release 6 trainer to trainee session

Similar presentations


Presentation on theme: "NCR FastLane Release 6 trainer to trainee session"— Presentation transcript:

1 NCR FastLane Release 6 trainer to trainee session
Gibson Prevot November, 2015 NCR SSCO 6

2 Agenda R6 HW System Architecture(Electrical, Mechanical, Wiring, communication port assignment, DMI info, Cleaning etc…) R6 HW Configuration R6 initial country release R6 Modules

3 Release 6 Hardware Components
Next Generation Platform Release 6 Key Benefit Note Recycling EUI Enhanced cash management Improved performance, capacity, and reliability Reduced cost & complexity. Global Coin Recycler Single global device that recycles all coins (no overflow box), improved performance & reliability, increased capacity, reduced cost and coin recycling. Next Gen All In One Ebox Zero Bezel, Multi Touch Next Gen All In One Latest Chip Set & Performance 7878 or 7879 All Imaging More integrated look for scanner Drop & Go Self-Service Printer Improved usability, enhanced reliability All LED Lighting Improved aesthetics , reduced power consumption Integrated Convertibility Modern Design Language Enables small & large footprint convertible operations w/o limiting basket size or changing shopper movement Enhanced Security Enclosure 10% Smaller Footprint, Improved security with field configurable lock

4 GSR50 Note recycler Module specification Module functionality
Module operation Module configuration Subcomponents Sensor diagram Cleaning sensor Errors codes Diagnostics Predictive Features

5 CR5000 Coin recycler Module specification Module functionality
Module operation Module configuration Subcomponents Sensor diagram Cleaning sensor Errors codes Diagnostics Predictive

6 SSCO6 1 ST & 2 ST Printer Modules specification Module functionality
Module operation Module configuration Subcomponents Sensor diagram Cleaning sensor Errors codes Diagnostics Predictive

7 R6 Security Scale and Load cells
Module specification Module functionality Module operation Module configuration Subcomponents Sensor diagram Cleaning sensor Errors codes Diagnostics Predictive

8 R6 I/O Box/Misc IF/ Trilight and coupon Led
Module specification Module functionality Module operation Module configuration Subcomponents Sensor diagram Cleaning sensor Errors codes Diagnostics Predictive

9 R6 UPS Module specification Module functionality Module operation
Errors codes Diagnostics Predictive

10 R6 Scanners Modules specification Modules functionality
Modules operation Modules configuration Subcomponents Sensor diagram Cleaning sensor Errors codes Diagnostics Predictive

11 R6 EBOX/Displays/Touch
Module functionality Module operation Module configuration Module specification Sensor diagram Errors codes Diagnostics Predictive

12 R6 platform for diagnostics
USB Dongle PML Utilities

13 SCO6 Odometers 7879 XR7 UPS Printer I/O Box Coin Recycler
System Up Time Primary Screen On Time Good/Bad MSR Swipes System Startup Count System Shutdown Count Cash Drawer Open Count System FAN On Time CPU throttle time 7879 Seconds on since last boot Count of Failed front panel Count of Scale hardware error Count of Scale needs calibration error Count of Bridge communication failed Count of Scale error due to extreme drift + or – Count of Scale  calibrated UPS Odometer available in September Printer Boot firmware Receipt lines tally Knife cut tally Hours on tally Knife jams tally Cover openings tally Max temp tally + additional readings I/O Box Odometer available in September Coin Recycler Chassis Module( main controller) Numerous readings Coin Validator Module Active Cashbox Module Hopper Module (s) (1, 2, 3 or 4) Door controller Module Note Recycler Main module (contains bill validator) Numerous readings Loader cassette Recycler module Cashbox ECB counterfeit module -Numerous readings


Download ppt "NCR FastLane Release 6 trainer to trainee session"

Similar presentations


Ads by Google