Presentation is loading. Please wait.

Presentation is loading. Please wait.

New calibration strategy – follow-up from the production review

Similar presentations


Presentation on theme: "New calibration strategy – follow-up from the production review"— Presentation transcript:

1 New calibration strategy – follow-up from the production review
ALICE Offline 07/02/2011

2 GSI proposal Slide courtesy of Silvia Masciocchi

3 Assumptions Weekly AliRoot updates (Rev + AN tag)
All PWGx + AOD filtering trains run in synch Weekly OCDB updates (in addition to Pass0) n=4 calibration passes until ready for Pass2 period length = 4 weeks Reconstructed sample = 10% of full sample If period + calibration passes not sufficient, the shema can be extended

4 Calibration passes – one period
CPass #1 CPass #2 End of period Ready for Pass #2 CPass #3 Cpass #4 (full 10% cycle) CPass #5 (full 10% cycle) CPass #6 (full 10% cycle) CPass #7 (full 10% cycle) 1 2 3 4 5 6 7 Week #

5 Repartition of Cpass #x
PWG2 Analysis train AOD train + tender PWG3 Analysis train Pass0 reco Pass0 Calib train + OCDB update Cpass #x reco PWG4 Analysis train PWG1 QA train Muon AOD train In total: 2 reco passes 2 calib train passes 6 PWG+AOD trains Ready Cpass #x Calib train + OCDB update Not automatic TBD

6 Summary of period pass Calibration (post Cpass #x) to be discussed
Total data volume – 55% of RAW Calibration (post Cpass #x) to be discussed What will be updated here? What is the required ouptut of CPass #x to allow for calibration Which detectors can join AOD and PWG#2, 3, 4 trains must run at the same time Strict discipline in the train code


Download ppt "New calibration strategy – follow-up from the production review"

Similar presentations


Ads by Google