Presentation is loading. Please wait.

Presentation is loading. Please wait.

KENTROS software update

Similar presentations


Presentation on theme: "KENTROS software update"— Presentation transcript:

1 KENTROS software update
KENTROS working group Talk by Bruno Golosio FIRST analysis meeting 12/04/2012

2 Recent work Charge equalization complete Z discrimination complete
Macros organized in svn subdirectories Added new class for high level rec. in kentros framework High level rec. implemented in a macro (as RecoTools) Approx. energy deposit from charge calibration Kinetic energy from energy deposit implemented

3 New HL rec. class “TAKErecTrack”
Main member variables: TAKEcalibHit hit1 (also hit2 when the track intersects 2 modules) : Equalized/calibrated hit data (module id, charge, time, etc.) TAKEtrack track: geometrical information about the track x0, y0, z0, ux, uy, uz from VTX/BM reconstruction Length of the intersection with kentros module(s) Ed: energy deposit (using temporary calibration parameters) Z: atomic number Double_t EkDep: kin. energy evaluated from Ed Double_t EkBeta: kin. energy evaluated from TOF (not done yet) time: relative to SC, corrected for TDCs fluctuations Time walk correction and t0 not yet implemented scintPath1 (also eventually 2): scintillation light pathlength

4 KENTROS High level reconstruction macros
in first/rec/trunk/macro/kentros/hlreco: KentrosHlReco.C For each production root file produces an output root file containing the reconstructed tracks on kentros KentrosHlHisto.C Template macro for extracting distributions from reconstructed tracks This is the main macro that should be used for kentros high level data analysis

5 Time/energy deposit intercalibration with TOFWall
On Kentros: Select reconstructed tracks hitting the small endcap with Z = 2 , qlim< q < 5.5° For each track evaluate intersection thickness Distribution of equalized charge and time relative to SC On TOFWall Match hits to tracks from VTX/BM Select tracks with Z = 2 , 5.5°< q <qlim Distribution of deposited energy and time flight

6 Current activities/next steps
Time/Energy deposit intercalibration with TOFWall D. Nicolosi, C. Agodi, B. Golosio, P. Oliva (from kentros side!) Check matching with VTX/BM, angular distribution for Z=1 and 2, implement geometry with TAGgeoTrafo class P. Oliva, V. Sipala Efficiency on protons vs gain, saturation on alpha vs gain, geometrical efficiencies, distribution correction strategies A. Brunetti Time walk correction (evaluate run per run for each module) D. Nicolosi, B. Golosio FUTURE WORK: Adapt MC version of the software to make it more close to the experiment (B. Golosio)


Download ppt "KENTROS software update"

Similar presentations


Ads by Google