Download presentation
Presentation is loading. Please wait.
Published byAugustine Baldwin Modified over 6 years ago
1
Security WG: Report of the Fall 2013 Meeting
Southwest Research Institute (SwRI) San Antonio, TX 31 October, 2013 Howard Weiss NASA/JPL/PARSONS skype: hsweiss
3
Meeting Agenda 28 October 2013 08:30 – 09:30: CCSDS Plenary
09:30 – 12:30: Systems Engineering Area (SEA) Plenary 13:30 – 17:00: Security WG Welcome, introductions, logistics, agenda review Review results of Spring 2013 (Bordeaux) meeting Status of documents, action items Charter review Key Management Blue Book (Fischer/Aguilar-Sanchez) KM for SDLS extended procedures ESA Secure Software Development
4
Meeting Agenda (cont) 29 October 2013 (08:30 – 17:00)
Network Layer Security 1st Draft Review (Weiss) Network layer security over non-IP (Weiss) Testing (Sheehe) Threat book re-write (Black/Weiss/Biggerstaff) Link Layer Security Update (Biggerstaff/Weiss/Aguilar-Sanchez) AERO algorithm (Weiss) Other areas of discussion Proposed new areas of work 30 October 2013 08:30-17:00: Space Data Link Security WG 31 October 2013 08:30-12:30: Space Data Link Security WG 13:30-17:00: SEA Wrap-up Plenary
5
Attendance Name Organization Email Address Howard Weiss (Chair)
NASA/JPL/PARSONS Gordon Black UK Space Agency/CGI Daniel Fischer ESA/ESOC Martin Pilgram DLR Craig Biggerstaff NASA/JSC Ignacio Aguilar-Sanchez ESA/ESTEC Chuck Sheehe NASA/GRC Dorothea Richter Julian Airaud CNES Ed Greenberg (Mon PM) NASA/JPL
6
Executive Summary Attendees from UK Space Agency, ESA/ESTEC, ESA/ESOC, DLR, CNES, NASA/JSC, NASA/GRC, and NASA/JPL. Due to sequestration budget issues NASA Goddard representative was unable to travel. No charter or framework changes were required. Reviewed action items from Bordeaux. Carrying several forward and all others were completed. Reviewed draft of 1st revision of Threat GB. Comments & discussions will be folded into 2nd revision. Reviewed 1st draft of Network Layer Security adaption profile. Section 2 needs to be re-written per comments. NASA/GRC will perform testing and will write the Yellow Book. CNES may also perform testing. Provided an overview of the AERO (Authenticated Encryption with Replay prOtection) algorithm that might be useful in the future. ESA did had no updates regarding Key Management but did discuss their effort in developing policies on secure software development. SDLS: discussed Red-3, extended procedures, and GB.
7
Summary of Goals and Deliverables
KM Blue/Magenta Book for symmetric KM is progressing. Reviewed Threat Green Book revisions. Reviewed network layer security “adaptation” profile draft. Investigate how IPsec could be used over non-IP protocols. NASA/GRC to write Yellow Book and perform testing. CNES may also perform testing. Reviewed AERO algorithm for possible future use. Reviewed SDLS progress in SecWG Discussed ESA secure software standards. Discussed SDLS progress.
8
SUMMARY TECHNICAL STATUS
SEA Area MID-TERM REPORT SUMMARY TECHNICAL STATUS Security WG Goal: Working Status: Active _X_ Idle ____ Summary progress: documents actively being produced: Key Management BB, Threat GB revision, Network Layer BB. All docs green. Progress since last meeting: threat GB 1st rev, network layer security 1st draft. Problems and Issues: Resources – Loss of NASA resources (GSFC) is an issue. status: OK CAUTION PROBLEM Comment: Working Group is advancing and producing good products. Docs OK.
9
Near-Term Schedule Deliverable Milestone Date Key Management Blue Book
Continue drafting next revision 02/14 Network Layer Profile 2nd draft 01/14 Threat Document Revision 2nd revised draft 11/13 Network Layer Yellow Book 1st draft
10
Near-Term Schedule (cont)
Common Criteria Protection Profiles Future TBD Application Layer Security SW Defined Radio Security Physical Layer Security (Channel Coding) Mission Operations document
11
Open Issues None
12
Action Items Item Number Action Item: Assigned to: Date Due:
SecWG1013:1 Review existing list of Threat GB threats for additions, deletions, expansion, etc. All 12/16/13 SecWG1013:2 Revise Threat GB Howard Weiss 11/15/13 SecWG1013:3 Revise Network Layer Security Adaptation Profile SecWG1013:4 Discuss status of DTN Bundle Security Protocol re-write with Scott Burleigh 11/10/13 SecWG1013:5 Revise Network Layer Security testing configuration. Chuck Sheehe SecWG1013:6 Investigate CNES performing Network Layer Security testing Julien Airaud SecWG1013:7 Write white paper on ideas about network layer security for non_IP environments Ignacio Aguilar-Sanchez & Daniel Fischer 02/20/14
13
Resource Problems Resources had been adequate to perform the current tasks although personnel have only limited time percentage to apply to CCSDS tasks. Recent loss of NASA personnel will hurt unless they can be restored to attend meetings.
14
Risk Management Update
Must ensure that the current trend of additional resources remains and that resources don’t shrink.
15
Cross Area WG / BOF Issues
Joint meeting with Space Data Link Security WG Continued interaction with DTN and Spacecraft Monitoring & Control although no joint meeting in San Antonio.
16
Resolutions to be Sent to CESG and Then to CMC
None.
17
New Working Items, New BOFs, etc.
None.
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.