Presentation is loading. Please wait.

Presentation is loading. Please wait.

Preliminary Survey Results 10th Nodes Committee Meeting - Copenhagen

Similar presentations


Presentation on theme: "Preliminary Survey Results 10th Nodes Committee Meeting - Copenhagen"— Presentation transcript:

1 Preliminary Survey Results 10th Nodes Committee Meeting - Copenhagen

2 Context The development of a Custom Portal or Nodes Portal Toolkit has been identified as a need by the Nodes since 2003 Workshop held in Copenhagen in 2005 Efforts at that time focused in developing

3

4 NPT Development: A participatory process
Need is identified by the community Exactly what is needed? By whom? How this would relate to existing developments? Is this already included in the GBIF Work Programme? Preliminary assessment Capturing specific requirements Defining an implementation plan – community development? Alpha and beta testing processes Take up and roll over – full implementation

5 Developing a Nodes Portal Toolkit – Preliminary Survey Results
Development of NPT key activity in the Work Programme Online survey designed to assess needs and priorities for NPT 26 GBIF Participants responded: 21 countries, 5 international organisations – LOW RESPONSE Based on 31 countries that answered the question in the 2009 report.

6 What is the current interest from the Participant Nodes on the NPT?
The majority of Participants responding to this survey will either certainly install and use a GBIF NPT (43%), or possibly install and evaluate it (43%). 7% of the respondents indicated that they won’t use such system because they already have one in place

7 Priorities concerning NPT features

8 Data types to be integrated in a NPT

9 Availability of infrastructure at the Node level to host a biodiversity portal internally

10 Nodes participation in a Requirements Capture and Analysis Phase?
Yes: 76% (19 Participants) No: 24 % (6 Participants)

11 Availability of developers from the Nodes to collaborate in the development of NPT

12 Technical skills within the Nodes’ teams: Software technologies

13 Technical skills within the Nodes’ teams: Various technologies

14 Options for the basis for the development of the NPT

15 General Recommendations
Present and discuss these preliminary results with the Nodes Committee at the GB16 Meeting in Copenhagen. Use the Copenhagen meeting to get general feedback from those Participants who didn´t respond to the survey. The objective will be to get more accurate information about the number of Participant Nodes who need or are interested in a Nodes Portal Toolkit.

16 General Recommendations
Convene an Advisory Nodes Committee group to help define the scope of the NPT (within the context of the GBIF Informatics Infrastructure and according to the Participants’ needs). This advisory group will work with the Secretariat staff in producing: A scoping document for the NPT (focusing on the more general and strategic aspects), plus a first set of specific requirements for the NPT development A set of recommendations on how to develop, implement and deploy such a portal toolkit.


Download ppt "Preliminary Survey Results 10th Nodes Committee Meeting - Copenhagen"

Similar presentations


Ads by Google