Presentation is loading. Please wait.

Presentation is loading. Please wait.

Rube Goldberg Project Friday, May 19, 2017.

Similar presentations


Presentation on theme: "Rube Goldberg Project Friday, May 19, 2017."— Presentation transcript:

1 Rube Goldberg Project Friday, May 19, 2017

2 Friday, 5/19 Unit: Rube Goldberg Project
Communications Managers pick up your team folders and meet me at the back lab table. Upcoming dates Friday, 5/19 – video of Rube Goldberg due at intermission Friday, 5/19 – exemption window closes (Rube Goldberg grade will be included for determination of exemption) Tuesday, 5/23 – Bottle rocket materials are due. Thursday, 5/25 – Bottle rocket launch Thursday, 6/1 – Exam (10:50 to 12:50)

3 Today’s Deliverables Remember your Rube Goldberg Machine video is due at intermission on Thursday, 5/18 (B-day) and Friday, 5/19 (A-day). If applicable, your videos to and circle the additional points, on the last page of the project document, you feel you have earned.

4 Bottle Rocket Overview
2 – 2 Liter bottles of Soda make sure they have been emptied and washed out before bringing them to class Duct tape Card board for your airfoils Something to balance the nose

5 Bottle Rocket Deliverables
Complete part 1 of the Bottle Rocket packet. Resources links can be found on the project overview document. Complete section 2 and 3 and have me sign off on your design and materials list.


Download ppt "Rube Goldberg Project Friday, May 19, 2017."

Similar presentations


Ads by Google