ISS Team members: Elena Firu, Veta Ghenescu, Alina-Tania Neagu, Titi Preda, Sorin Zgura. About 60% Infrastructure: In construction a laboratory for sensor characterization. In present we have a room and a few Keithley instruments In summer of 2013 a project was applied to ANCS (National Agency for Scientific Research) . At the ROSA (Romanian Space Agency) request I & ISS director will present in near future a proposal to finance the infrastructure needed for study of sensors in space science (Si, GaAs) . Topics (from September 2011): - Test beam and test beam analyses - Monte Carlo simulation of test beam started at the beginning of 2013 For near future: Next test beam test beam analyses Monte Carlo simulation for test beams