Jambudiyapura: Total Sanitation (IL&FS CSR, GRICL & Clearford)

2 Village: Survey 56 Houses, School, Anganwadi 50-70 LPCD 8 houses had Toilets 2 Houses had Toilets & Bathrooms Open pools of contaminated water breeding mosquitos. 1 Twin-Pit 4 DRDO Systems Deenbandhu Sintex Bio-Digester Soak Pit Soak Pit & Open Discharge Worm based Digestion

3 Strategic Goals Holistic and Sustainable Solution – NO Soak Pits
Annual O&M should be minimized and the installed system should be maintainable by the villagers themselves. Collect, transport and treat all the wastewaters generated. Build toilet, bathroom, mori for individual homes. The treated wastewaters should ideally be reusable for irrigation purposes benefiting villagers crops in the summer months. Villagers to be trained to operate the system.

4 Stakeholder Discussions
Involvement of Villagers at all levels including: - Understanding their wishes - Discussions on ODF concepts - Installation issues such as locations of components. Mtgs with Village Deputy Sarpanch, Tehsildar Two Gram Sabhas held Mtg with DDO Signing of MOU between GRICL & Gujarat Government to create ODF Village at Jambudiyapura

5

6 Smart Digester™

7 Network Advantages Shallower Trenches. Faster and Easier to Install.
Fewer sewage lift stations. Sealed HDPE Pipes. Manholes replaced by SAP’s at m intervals.

8 Installation

9 Funding O&M Villagers agreed to pay Rs per household into a common bank account specifically setup to manage the project. Any funds received by the villagers from the government for building of Toilets would also be put into this Bank account and not retained by the villagers. A Sanitation Committee would be setup of villagers to manage these funds. Household User Charge or Sale of Water for Agriculture (Rates TBD)

10 O&M Costs Approximately 10 Units of power / Day (Rs. 5/Unit)
Rs. 1500/Month SBT STP Catalysts: Rs /Month Clearford Network: Flushing only required in case of rare Blockages. Anaerobic Digesters: Anticipated 7 – 10 years cleaning cycle Rs /Cleaning. Local Handyman Rs. 3000/Month (Requirement post exit TBD)