Presentation is loading. Please wait.

Presentation is loading. Please wait.

Rate Increases: Reasons Methods.

Similar presentations


Presentation on theme: "Rate Increases: Reasons Methods."— Presentation transcript:

1 Rate Increases: Reasons Methods

2 Reasons: Capital Projects Cost of Service

3 Capital Projects

4

5

6 WATER TREATMENT PLANT Design Capacity 5.3 MGD
Current Daily Production MGD Current Daily Production 77% of Capacity KDOW Limit = 85% Capacity MGD Available Capacity ,000 Gallons per Day At 1% Population Growth Year 8 Years to Restrictions Design & Construction = 3 Years

7 Rates

8 Max Daily Production 95% or Greater in 7 of 11 Years
Max Daily Production 100% or 101% in 3 of 11 Years Average Age of Plant: Years Depreciation Schedule for Plant: 15 / 20 / 40 Years Plant is Prone to Flooding Water Quality Increases = Plant Capacity Decreases

9 Methods 2-Part Computer Model: Part A – Revenue Increase %
Part B – Convert % to $

10 Part A – Input Current Expenses Capital Plan Dollars and Dates
Current Revenue Current Expenses Capital Plan Dollars and Dates Loan Terms – Interest and Time

11 Part A – Output $ Available 1.4 $ Due Debt Service Ratio =
Cash Reserve Days 1.4 = $ Due

12

13

14 Part A Output Part B Part B Output $ Rate

15 Part B

16 50 Industrial @ $0.40 $20.00 $50.00 100 gal 50 Residential @ $0.60 $30.00 50 Industrial @ $0.70 $35.00 $70.00 100 gal $35.00 50 Residential @ $0.70 @ $0.70 @ $0.70 $70.00 = 1.75 = 1.17 = 1.40 @ $0.40 @ $0.60 $50.00 Industrial Increase 75% Residential Increase 17% Overall Revenue Increase 40%

17

18

19

20

21

22


Download ppt "Rate Increases: Reasons Methods."

Similar presentations


Ads by Google