Presentation is loading. Please wait.

Presentation is loading. Please wait.

Dummy Stick model with expected contributors

Similar presentations


Presentation on theme: "Dummy Stick model with expected contributors"— Presentation transcript:

1 Dummy Stick model with expected contributors
All the tolerance in X, Y and Z dir z x Assembly Components y Revolute Joint ±1 Link-1 Link-2 2b ±1 2a 5b Link-3 ±1 Assembly 5a Link-5 Universal Joint 4c ±1 ±1 ±1 Link-4 4a 4b Spherical Joint Spherical Joint Or Revolute Joint Expected contributors : Measurement 1 : Angle between plane on link3 and XZ plane : 2b-Y 2a-Y 4a-Y 4b-Y Measurement 2: Angle between link3 ( 4a to 2a) and ZY plane 4c-X 2b-X 2a-X 4a-X 4b-X Measurement 3: Nominal point variation of link 3 in Z direction 2b-Z 2a-Z 4a-Z 4b-Z


Download ppt "Dummy Stick model with expected contributors"

Similar presentations


Ads by Google