PRODML SIG Team and General SIG Meetings October 13-14, 2009 Schlumberger SIS Offices, Houston.

Similar presentations


Presentation on theme: "PRODML SIG Team and General SIG Meetings October 13-14, 2009 Schlumberger SIS Offices, Houston."— Presentation transcript:

1 PRODML SIG Team and General SIG Meetings October 13-14, 2009 Schlumberger SIS Offices, Houston

2 General SIG Status

3 SIG Team Structure Steering Committee Use Case and Marketing Team
Operations Team Use Case and Marketing Team Co-Chairs: Laurence Ormerod, (open) Specifications and Architecture Team Co-Chairs: Bill King and Bill McKenzie Deployment Support Team Co-Chairs: Duncan Ord, (open) Energistics Alan, Gary, Jana, and Robin [from PDS]

4 Specifications Team

5 PRODML Standards: Release Schedule
PRODML Standards: Release Schedule Target Date 2009 Actual Date Release Item End Jan Early Feb PRODML Services Version 2.0 Candidate Release SAM and GDA services Measurement Object Schema (Context Free Schema) End Feb End March PRODML Data and Services Version 1.1 Resolve namespace issue caused by incompatibility with WITSML Consider removing WITSML specific services Mid June PRODML Services Version 2.0 Introduction of GDA/SAM service   End of June Mid-October PRODML Data Version 1.2 Add wellTest options Clarify volume report Q4 PRODML Data Version 1.3 Deferred production Alarms and events Well test – transient (from 08) NOJV (from 08) PVT and lab sampling PRODML Services Version 2.1 Additional SAM services

6 PRODML Services V2.0 PROD_AssetRegistry GetServiceInfo GetReferences
GetItemIdList PROD_GenericDataAccess GetCapabilities GetData PutData PROD_GenericDataProcessor ProcessData

7 PRODML Implementation Demos
The next slide illustrates the Distributed Temperature Survey demonstration. Other current demonstrations are Shell’s automated well test validation demo, Chevron/Moblize’s integrated demo of WITSML and PRODML Standards, and Pioneer’s asset team production monitoring interface demo.

8 Shell 2009: V2.0 Services, Proof of Concept
Distributed Temperature Reconciliation Workflow automation (above) Orchestration (right) Sequence diagram (left)

9 Representative Workflow Laurence Ormerod, Weatherford
Gas Lift Design Representative Workflow Laurence Ormerod, Weatherford

10 Gas Lift Design Process Outline
GL Design – uses installed mandrel depths, spec. valves GL Co may specify Completion Design: tubulars and GL valve depths variables GL Co may advise Installation, with Blank GL mandrels Depth “as installed” Completion Co. Valves Installed by slickline. Well operating Drill well: Results inform completion design Valve Design ? Known ?