Presentation is loading. Please wait.

Presentation is loading. Please wait.

AIRPORT NOISE MITIGATION PROGRAM

Similar presentations


Presentation on theme: "AIRPORT NOISE MITIGATION PROGRAM"— Presentation transcript:

1 AIRPORT NOISE MITIGATION PROGRAM
Recommended Measures Sensitive Facilities Committee

2 Completion of Mitigation
Suggest a timeframe be prepared to speed up and complete current mitigation proceedings before new mitigation begins.

3 Order to Complete Mitigation
(1) Sensitive Facilities and Residences in the 65+ DNL (2a) Residences in the 60+ DNL (2b) Sensitive Facilities in the 60+ DNL

4 Planning and Zoning Implement a requirement through the Planning Commission that, effective after approval of the 150 study, noise reduction be required in residential and sensitive facilities that may be built in the noise impact area

5 Confirmation of Noise Reduction
Implement that measurement of noise be required after noise mitigation is completed, to confirm reduction has been achieved and in compliance with FAA standards

6 Other Items to Explore Include an illustrative (not definitive) list of noise-sensitive facilities Recommend analysis for possible placement of a noise barrier to provide noise reduction to the residents of Preston Park


Download ppt "AIRPORT NOISE MITIGATION PROGRAM"

Similar presentations


Ads by Google