Presentation is loading. Please wait.

Presentation is loading. Please wait.

Banner XE Beyond The Hype Presentation by: Chris Frost Simon Chio.

Similar presentations


Presentation on theme: "Banner XE Beyond The Hype Presentation by: Chris Frost Simon Chio."— Presentation transcript:

1 Banner XE Beyond The Hype Presentation by: Chris Frost Simon Chio

2 Banner XE Beyond The Hype Presentation by: Chris Frost Simon Chio

3 Banner XE Beyond The Hype Presentation by: Chris Frost Simon Chio

4 Banner XE 9 Beyond The Hype Presentation by: Chris Frost Simon Chio

5 Quick Recap to Banner 9 STEP ONE: Sell the Upgrade
STEP TWO: Plan Resources STEP THREE: Find Your Single Sign-On (SSO) Solution STEP FOUR: Set Up SSOManager STEP FIVE: Set Up Ellucian Solution Manager (ESM) STEP SIX: Deploy New Admin (INB) Servers STEP SEVEN: Set Up Application Navigator STEP EIGHT: Train and Test

6 Sell the Upgrade When is the Effective Deadline for INB De-support
December 2018 October 2018 August 2017 Greatest Vulnerability & Cause for Concern Only One Browser Still Supports the INB Plugin Internet Explorer Could Announce Discontinuation of Support at Anytime

7 Sell the Upgrade What is Your Backup Plan for INB Browser Support
Freezing Updates on Firefox Developing a Bare Bones Plugin Browser Using a Desktop VM OUR GOAL: Have a 90 Day Window to INB Replacement

8 Sell the Upgrade Make Everyone Aware of the Risks and Benefits
Share the Overall Approach to Banner 9 Do this Early and Often Build Regular Communication between IT and End Users Monthly Banner User Group Meeting Report Status to the IT Steering Committee

9 Sell the Upgrade Promote Banner 9 Videos and Literature with Users
ODSL Webinars Curate the Documentation Provide Users with Relevant User and Release Guides i.e. Student Self Service Release 9.5 Keep Them Informed about Important Milestones

10 Sell the Upgrade

11 Plan Resources - Hardware
Virtual Servers or Physical Hardware or Cloud Operating System – Red Hat Linux 7 Database Server – Oracle 11g or Oracle 12c Application Servers: Tomcat or Oracle Web Logic Other Product Dependencies: DegreeWorks & XE Registration Banner Document Management (BDM) Banner Workflow

12 Plan Resources - Hardware
Planning Worksheet Assess the Number of Servers Needed Number of Environments – Dev, Test, Production ESM SSO Solution Memory and Storage Needed

13 Plan Resources - Hardware
Server Planning Sheet Naming Convention for Servers Used to Build Out New VM Cluster SERVER SERVER DESC CPU RAM (GB) DISK SPACE (GB) OS LOAD BALANCED LEODBPROD Banner Database Server - Production 8 64 3400 Linux LEOBANPROD Banner Apps Server 4 160 LEOWLINB01 Banner INB Server 131 X LEOWLINB02 LEOWLSSB01 Banner SSB Server 16 140 LEOWLSSB02 LEOWLWEB01 Banner Web Services 40

14 Plan Resources - Hardware
Ellucian Updates Active Directory

15 Plan Resources - Hardware
Active Directory Ellucian Updates

16 Plan Resources - Hardware
Build Out Templates for the Various XE Boxes Generic XE Image for Oracle Fusion Middleware XE Allows Us to Replace with Old Weblogic Boxes New Oracle 12 Fusion Middleware Boxes Developed a Requirements Sheet to Accompany Each Requested XE Server Memory, Storage Size, Mounted Drives

17 Plan Resources - Hardware
Server Requirement Sheet Solution Evaluation Vendor Support for Technical Concerns For each question, please provide a descriptive answer and/or additional comments: IFXR Request New UNIX Server 1 If SFTP account, what name is requested for the account? N/A 2 Will the server password expire? 3 What will be the local file retention policy? 4 What location will be generating the extract? (i.e. leobanprod, leobanqa, etc.) 5 What will be the naming convention of the extracts? 6 If SFTP account, will the files need to be directed to another location? 7 If new server, what will be its name? LEOADMDEV01 8 If new server, will a template be used? If so, which one? Yes, Use LEOXEIMAGE as a Template 9 If new server, what is the operating system to be used? Red Hat Linux 7 10 If new server, what are the minimal requirements for the hardware? 4 vCPU, 16 GB RAM, 120 GB (2 Drives at 60 GB Each), 11 If new server, what local accounts need to be set up? oracle, X-windows will need to be enabled for WebLogic Install

18 Plan Resources - People
Plan the Project Break Down Banner XE into Major Milestones Get Commitment for Preliminary Starting Dates Estimate Hours for Each Task Account for Blackout Dates, Holidays, and Other Projects Have the Project Plan Drive Estimates on Hours Let Administration Know What Those Hours Will Be

19 Plan Resources - People
Hourly Assessments

20 Plan Resources - People
Protect Your Key Banner Resources Offload Responsibilities to Others Start an Internship or GA Program Requires an Investment of Time in Training and Admininstrative Overhead Worth It Can help with reporting and routine responsibilities Fresh blood within the department

21 Single Sign-On (SSO) Solution
Ellucian Identity Solution (EIS) provided free of charge On Active Directory installs, set up initial user store to Internal JDBC Database Do not set up to create Admin in config properties file unless you have Directory Manager level permissions with your Bind User Shibboleth is also an alternative Must support CAS 2.0 and preferably CAS 3.0

22 Single Sign-On (SSO) Solution
Each user needs a UDCID assigned in GOBUMAP UDCID should be added into Active Directory Banner users need to be reconciled against Active Directory user accounts Recommend GOBTPAC_LDAP_USER as a Spot to Store Active Directory Username Helps match users between two systems

23 Single Sign-On (SSO) Solution
Audit Banner Against Your School Directory Many Times Deans and Vice Presidents are not in Banner Adjuncts are Also an Issue Many Can Slip through the Onboarding Process

24 Single Sign-On (SSO) Solution
Blackboard / Starfish AD Banner Banner TAMU WebFocus Banner XE Unique Identifier 098908YVF7890 AD AD Username Oracle Username UIN Webfocus Username Blackboard ID

25 SSO Manager Initially portrayed as optional
Banner 9 is CAS-aware, Banner 8 is not Left off project plan at first because we were going with all Banner 9 Admin modules at once Necessary for links into Banner 8 Self-Service Banner (SSB) Makes seamless navigation possible

26 Ellucian Solution Manager
ESM is mandatory to get Banner 9 updates Works with your Banner Job Submission Server Seems to handle app deployments well, database scripts can require some manual “pushes” at points

27 Replace INB with XE Admin
Deploy BannerAdmin Comes as One Deployable War File Can Deploy Individual Modules or Pages Controlled within Banner

28 Application Navigator
One Stop Link to Banner Apps Allows Seamless Navigation Between Banner 8 and Banner 9 Apps Since We are Launching a Portal, Rebranded Banner 8 SSB with New Look

29 Train and Test Banner XE Working Sessions Reserved a computer lab
Set up recurring five hour appointment with primary Banner functional users Kept running issues log updated each week

30 Train and Test Navigation Aids
Developed Navigation Guide Made Sure to Include All Keyboard Shortcuts After Initial Visual Shock, Even Old Time Users Settled In After an Hour and a Half Place to Share Important Banner XE Information


Download ppt "Banner XE Beyond The Hype Presentation by: Chris Frost Simon Chio."

Similar presentations


Ads by Google