2 Contents Case I: Replacement motors and installation of speed variator
Case II: Energy Generation using Biomass Case III: Replacement inefficient motors and improve the electric installation Challenges and opportunities

3 1 Replacement motors and installation of speed variator

4 Project description Company: Produce balanced food for pork farmers.
Location: Irapuato, Gto. CFE rate type: HM (medium voltage) Contractual price: $1.236 MXP / kWh Electricity Spending: $ 1,569,000 MXP per year EE Project : Replace motors and installation of speed variator Potential savings : 25%

5 Operación no constante
Current condition Procedure : Perform electrical measurements to determine operating conditions Check operating conditions 1 2 Operación no constante Current motor

6 Current conditions Procedure : 3
Determine the operation project scope. Evaluate the baseline consumption using ESI method and define baseline energy index. 4

7 Proposed operation condition
Procedure : 1 Define new equipment (motors and drives) inside the perimeter of the project. Calculate proposed energy index. 2

8 Example : Energy Index in Motor #1
Proposed operation condition Results to complete the formats 3 y 3-A using ESI-FIRA Methodology Example : Energy Index in Motor #1

9 Proposed operation condition
Procedure : Results to complete the formats 3 y 3-A using ESI-FIRA Methodology Baseline energy consumption 631,680 kWh Proposed energy consumption 471,937 Energy saving 159,742 Saving in % 25% % Resultados totales

10 2 Energy Generation using Biomass

11 Project description Company: Extraction and Processing of coconut palm oil Location: Chiapas. Beginning of operations : November 2016 CFE rate type: HM (medium voltage) 2867 kW in demand Contractual price: $ Mx/kWh Electricity Spending: $227,107 MXP per month, Current capacity 40% EE Project: Generation of energy using steam generated by biomass Equitment: Steam generator 1.3 MW Potential savings : 83%

12 Current condition Procedure : Take advantage of residual process steam
The sterilization process is carried out by subjecting the clusters of fresh palm fruit to the action of water steam in horizontal cylindrical vessels Tank Biomass Boiler Supply Steam

13 Current condition Procedure : Define Project Perimeter

14 Current condition Procedure : Define based energy index.
Production of 1210 tons of fruit with a consumption of 64,056 kWh / month, having a production index of 53 KWh / Tn Projection of annual production Periodo años Racimo de fruta fresca Consumo de energía eléctrica CFE MWh/año Índice KWh/Tn 2017 71,281 3,806.75 53.40 2018 110,090 3,907.95 35.50 2019 137,658 4,886.55 2020 169,160 4,503.60 26.62 Promedio 488,189.00 17,104.85 35.04

15 Proposed Operation Condition
Procedure : Determine perimeter of power generation project. The project consists of installing a steam generator of 1.3 MW, in order to use the steam that is used in the process of sterilizing the fruit, which is produced by means of a boiler with a capacity of 25 tons of steam

16 Year Energy Generation MWH 2017 2018 2019 2020 Average
Proposed Operation Condition Procedure : Calculate power generation 83%. Year Energy Generation MWH 2017 3,109 2018 3,202 2019 4,003 2020 3,904 Average 14,217.89

17 Proposed Operation Condition
Procedure : Results of baseline vs. proposed consumption index to complete formats 3 y 3A 3

18 3 Replacement inefficient motors and improve the installation

19 Project description Company : Mango fruit Packing
Location: Mazatlán, Sinaloa CFE rate type: HM Half price: $ MXP /kWh Electricity Spending : $350,800 MXP per year EE Project: Replacement of 22 inefficient motors for high efficiency. Potential savings : 47%

20 Current condition Procedure :
Perform electrical measurements to determine operating conditions Check operating conditions 1 2 Motores sin datos placa

21 Current condition Procedure : Define the project operation perimeter
Evaluate baseline consumption using ESI Method and define baseline energy index. 3 4 M Deshidratadora Empaque Cuartos Fríos Medición CFE Subestaciones Líneas de proceso Con equipamiento obsoleto, motores, cableados, accionamientos. Acometida CFE

22 Proposed Operation Condition
Procedure : 1 Define new electric motors and the perimeter of the project, including change of wiring, protections, reducers. Calculate proposed consumption index 2

23 Evaluación de índices Energético por Motor
Proposed Operation Condition Procedure : Results to complete the formats 3 y 3A 3 Evaluación de índices Energético por Motor Summary Baseline energy consumption 40,758.42 kWh Proposed energy consumption 21,746.09 Energy saving 19,012.33 Saving in % 47% %

24 4 Challenge and opportunities

25 1 2 3 Challenge and opportunities
ESI-FIRA must consider training programs for providers about methodologies for assess energy efficiency measures and avoid difficulty in present projects under ESI Method 2 Acceptable technical knowledge of suppliers, but has no experience in evaluating and determining potential energy savings 3 It is critical that energy consumers require commitment of energy savings to providers