Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Times 100 Business Case Studies

Similar presentations


Presentation on theme: "The Times 100 Business Case Studies"— Presentation transcript:

1 The Times 100 Business Case Studies
Portakabin Lean production at Portakabin

2 Introduction to Portakabin
Part of the the Shepherd Group, established in 1960s One of the largest family-owned companies in European building industry Portakabin is a registered trade mark Produces high quality modular buildings Used to provide space in schools, hospitals, nurseries, offices

3 Lean production Aims to minimise waste, improve efficiency, reduce defects Environmentally-friendly Leads to higher quality and added value Portakabin meets International Standards for quality (ISO 9001) and environmental management (ISO 14001) Portakabin reducing waste in three key parts of production Flow – value added as module goes through production Cellular – buildings created from modules to meet specific needs give customers value Batch – provides value through volume production

4 Continuous improvement (Kaizen)
Portakabin needs to give customers what they want or need Kaizen is Japanese for ‘continuous improvement’ Supports quality improvement Small, regular changes Everyone at all levels contributes ideas Problems are dealt with as and where they happen

5 Just-in-time (JIT) Just-in-time
Keeps down costs of stock or raw materials Less storage space needed Releases working capital Customer demand ‘pulls’ orders through system Ensures orders exactly meet customer requirements Problems may be discovered early and save rework Portakabin’s information technology systems record available supplies Ensures required components ordered in time to meet demand

6 Reducing waste In manufacturing process Recycling waste
Modules completed and fitted out off site Fewer workers and less transport required Use of standard width or pre-sized materials Re-use of door and window cut-outs Recycling waste Colour coded bins for collection of different types of waste Waste management teams to look for new ideas Volume of waste to landfill reduced by 60% over 3 years

7 Benefits of lean production
Financial Predictable construction time – saves labour costs Shorter lead time - gives happy customers Quality control – less waste, rework, unsatisfied customers Environmental Buildings 96% recyclable Better at retaining heat Social Reduced noise and pollution nuisance for communities Improved health & safety


Download ppt "The Times 100 Business Case Studies"

Similar presentations


Ads by Google