Presentation is loading. Please wait.

Presentation is loading. Please wait.

GÉANT2 update - II Otto Kreiter, DANTE.

Similar presentations


Presentation on theme: "GÉANT2 update - II Otto Kreiter, DANTE."— Presentation transcript:

1 GÉANT2 update - II Otto Kreiter, DANTE

2 E2E monitoring UP/DOWN status monitored across domains for p2p circuits 15 domains have deployed the MPs (measurement points) Visualization tool developed by GN2-JRA4 actively used by the E2ECU and NRENs Encouraging the different domains to include sub-wavelengths info in their MP/MA (ie. GE connections) Sandbox:

3 E2ECU E2ECU DOES :- Monitor End-to-End circuit
Send alerts about outages & maintenance Manage information flow between domains E2ECU receives fault alerts from :- End-to-End Monitoring System NOCs by These entities can send tickets to E2ECU :- Campus Network Administrators NREN NOCs GEANT2 NOC Tickets sent out to parties involved in a particular project, except e.g. research scientists themselves.

4 perfSONAR - MDM Service desk to support the Multi Domain Monitoring service Support perfSONAR products developed by GN2-JRA-1 IP performance measurements Pilot phase of the service being set up by JRA1 and SA3 GN2 activities for 5 NRENs DANTE Operations collaborating in setting up the service desk Looking for projects interested in the future to have the MDM service implemented

5 Monitoring summary E2ECU fully serving the p2p community of LHC & IGTMD Deisa on his way Ready to uptake other projects – EXPRES Involved domains should install the required MP and MAs or Should list the GE p2p links as well (currently mostly wavelengths are shown) EXPRES may be interested in the MDM service

6 Procurement update Connectivity procurement on-going
Tenders “will be” for dark fibre if feasible, else 10Gb/s or 2.5Gbps wavelengths. Key issues are connectivity to existing network and resiliency Router hardware procurement In the final phase – tender answers back 21st September Looking for hardware to replace old equipment! Key issue: a packet network for the future!

7


Download ppt "GÉANT2 update - II Otto Kreiter, DANTE."

Similar presentations


Ads by Google