1
Dr. Ron Lembke Operations Management
Project Management Dr. Ron Lembke Operations Management
2
What’s a Project? Changing something from the way it is to the desired state Never done one exactly like this Many related activities Focus on the outcome Regular teamwork focuses on the work process
3
Examples of Projects Building construction New product introduction
Software implementation Training seminar Research project
4
Why are projects hard? Resources- Planning People, materials
What needs to be done? How long will it take? What sequence? Keeping track of who is supposedly doing what, and getting them to do it
5
IT Projects Half finish late and over budget
Nearly a third are abandoned before completion The Standish Group, in Infoworld Get & keep users involved & informed Watch for scope creep / feature creep
6
Pinion Pine Power Plant
DOE Clean Coal Air-blown Integrated Gasification Combined Cycle Kellogg/Rust/Westinghouse gasifier GE Frame 6FA combustion turbine $335.9m, half DOE, half SPP
7
Coal Gasification Coal Gasification (new) Gas Fed into turbine
Coal into Low Heat Value (LHV) gas 130 btus/standard foot Crushed coal and limestone absorbs sulfur Hot gas desulfirized Particulate removal Gas Fed into turbine Tested fine on nat gas
8
Technology Development
Ash created in gasification, collected Hot-gas cleanup (new technology) SO2 in collected in calcium sulfate Hot-gas filter, then to combustion turbine Fines combustor burns particles bottom of filter Main problem was filter-fines removal Never operated more than 24 hrs. Tried 24 times to start it. Eventually mothballed
9
Project Scheduling Establishing objectives
Determining available resources Sequencing activities Identifying precedence relationships Determining activity times & costs Estimating material & worker requirements Determining critical activities
10
Project Personnel Structure
Pure project “Skunk Works” Functional Project Matrix Project
11
Work Breakdown Structure
Hierarchy of what needs to be done, in what order (Exhibits 2, 3) For me, the hardest part I’ve never done this before. How do I know what I’ll do when and how long it’ll take? I think in phases The farther ahead in time, the less detailed Figure tricky issues, the rest is details A lot will happen between now and then It works not badly with no deadline General Idea ? ?
12
Mudroom
13
Mudroom Remodel Big-picture sequence easy: Hard: can a sink fit?
Demolition Framing Plumbing Electrical Drywall, tape & texture Slate flooring Cabinets, lights, paint Hard: can a sink fit? W D W
15
Project Scheduling Techniques
Gantt chart Critical Path Method (CPM) Program Evaluation & Review Technique (PERT)
16
Gantt Chart
19
What do these 3 guys have in common?
Day before Thanksgiving, 2015, late afternoon, 27ºF
20
Summary Project management is hard Critical activities
Who is doing what? Critical activities Determine completion date Have to stay on top of them Gantt charts show what should be happening Can show the critical activities Hard to use them to figure out what is critical
Similar presentations