October 26th 2016

2 Horizontal Pump Overview
Deployment results from latest installation have proven the theory that varying degrees of depletion has occurred along the wellbore We base this on the following ; Recovered frac sand Gas interference at the heel area Cross flow Fluids separation Water traps

3 Gained Knowledge/Next Step
Effective pump positions in the horizontal section Initial production improvements tempered by water loading The results indicate stranded reserves remain in place The system is robust and versatile, allowed for consistent and selective inflow and outflow control from the frac ports to the production tubing Next Steps; The addition of electric over pneumatic activation, pressure monitoring and individual pump control will transition the system into a production management platform and allow commercialization in deeper longer wellbores Preliminary design work has begun, vendors have been identified and testing is continuing in the shop to determine flow dynamics associated with increased pump cycles.

4 2 deployments/different results
Pump# “Heel” 845mtr MD Pump#3 2015 966mtr MD Pump#2 2015 1114mtr MD Pump#1 2015 “Toe”1261mtr MD Pump#4 2016 “Heel”1005mtr MD Pump#3 2016 1125mtr MD Pump#2 2016 1245mtr MD Pump#1 2016 “Toe”1410mtr MD

5 Rod Pump Overview The 1.5” and 2.5” high angle Reciprocating Rod Pump are ready for commercialization. The pumps performed as expected in horizontal and high deviation >75deg landed angles The Large bore pump is in late development The company has a number of technical sessions booked with interested parties particularly for cyclic steam and high volume well bores. Seal technology testing is continuing for high temperature installs

6 Thank you