Presentation is loading. Please wait.

Presentation is loading. Please wait.

Rail Control Case Study - China

Similar presentations


Presentation on theme: "Rail Control Case Study - China"— Presentation transcript:

1 Rail Control Case Study - China
November 2013 © 2013 Mine Site Technologies Revision A

2 Control & Monitoring Station – Control Room
Tele-remote Control and Traffic Management Fixed Video Mobile Video November 2013 © 2013 Mine Site Technologies

3 Locomotive On-board Components
November 2013 © 2013 Mine Site Technologies

4 Fixed Video over MST Network
Low latency network backhaul for multiple HD video streams Camera status monitoring in MineDash November 2013 © 2013 Mine Site Technologies

5 Mobile Video from Locomotive
Low latency network backhaul for multiple HD video streams November 2013 © 2013 Mine Site Technologies

6 Tele-Remote & Status and Payload Monitoring
VIP facilitates on-board PLC communications November 2013 © 2013 Mine Site Technologies

7 © 2013 Mine Site Technologies
11/09/2018 Questions? Request Questions November 2013 © 2013 Mine Site Technologies © Mine Site Technologies 2012


Download ppt "Rail Control Case Study - China"

Similar presentations


Ads by Google