SUMMARY Of project of deep processing of rice with production capacity 2700 tons / year * *resume has familiarization and approximated character, preserving.

Similar presentations


Presentation on theme: "SUMMARY Of project of deep processing of rice with production capacity 2700 tons / year * *resume has familiarization and approximated character, preserving."— Presentation transcript:

1 SUMMARY Of project of deep processing of rice with production capacity 2700 tons / year *
*resume has familiarization and approximated character, preserving the order of digits

2 Deep processing of rice
In the context of contemporary realities of raw material crisis, search for stable income opportunities associates with the implementation of projects on the territory of the Republic of Kazakhstan in the sphere of processing of agricultural products. The project represents the purchase of know-how and the complete cycle of production and sale of rice on export, particularly: Rice starch of highest purification Rice starch – standard Rice protein of highest purification. Manufacturing will be located in the southern regions near the rice-growing enterprises. On the basis of the preliminary contract for the purpose of certification of manufactured products to the Asian market, the technological cycle of production will be controlled by the South Korean experts. The product is most in demand in the market of South Korea, China, Japan, Indonesia and India, due to traditional food and mass consumption. The project is fully export oriented on these countries. On the project implementation place is extensive resource base. (For reference: rice production in Kazakhstan in 2016 amounted 502 thousand tons).

3 Deep processing of rice
In addition, the sales market is investigated; there are agreements with potential partners from South Korea, who are willing to sign a contract to purchase of all products for several years ahead, as the demand on environmentally friendly products on the background of the increased quality of consumption in the Asian market is extremely high. Also, the cost of production, produced in Kazakhstan, will be much lower than in South Korea, due to several factors: the availability and optimum cost of use of land resources; low cost of labor resources; a new progressive production technology is protected by patents in South Korea; All of the above will allow to realize the project with payback in the short term and to obtain a high and stable income.

4 Scope of Business The total area of enterprise 0,7 hectares
Built-up area ,3 hectares The volume of raw material processing (rice, rice chaff is possible) tons/year Production output: ** Rice starch of highest purification (97-99%) 300 tons/year Rice starch (90-95%) tons/year Rice protein (90-95%) tons/year - consumption of clean water about 2 t/day - consumption of recuperation water t/day ** depending on the variety of rice

5 Scope of Business Major capital expenditures:
- design and estimate documentation - architectural and construction part - main equipment - supporting equipment - installation supervision and commissioning - coordination and management of the project Income from the sale of finished products $ US per year: - Rice starch of highest purification (97-99%) *7000 = - Rice starch (90-95%) *2500= 15  - Rice protein (90-95%) *6000= (Prices FOB Qingdao port) TOTAL  200 000$ US

6 Scope of Business Expenditure part
Products Expenditures Total Raw material Additional and unexpected Management Amortization Rice starch (97-99%) Rice starch (90-95%) - Rice protein (90-95%)

7 Scope of Business Operating profit ( p.6-p.7) 10 980 000$ US
Required capital for the execution of this project: – main production area sq.m. – laboratory, weighting room, office sq.m. – buildings for raw material acceptance sq.m. – storage space for finished products sq.m. – supporting equipment sq.m. 1 180 000$ US*** – main complete equipment (+ know-how)  000 000$ US – working capital (3 months)  000$ US TOTAL  000$ US Construction time is 10 months Payback period of total investment ( p.10/p.8)+10 months is 23 months. *** for existing buildings, the cost is formed on the basis of TOR (terms of reference).

8 Thank you for your attention!