Presentation is loading. Please wait.

Presentation is loading. Please wait.

CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team

Similar presentations


Presentation on theme: "CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team"— Presentation transcript:

1 CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team
News from TBTS CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team

2 RF measurements Diode power measurement Drive beam PETS 12GHz
PETS output Loop output CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team ACS input ACS output Probe beam ACS: 12WDSDVG1.8 - RF Diode & IQ measurements The expected attenuation is 77% => <15% RF measurement inconsistency 2

3 RF measurements and Acceleration
Estimated Acceleration from Diodes Drive beam PETS 12GHz PETS output Loop output CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team ACS output ACS input Estimated Acceleration from IQs Probe beam ACS: 12WDSDVG1.8 - RF Diode & IQ measurements All Diode and PETS and Loop output IQ signals are consistent with acceleration. 3

4 Illustration of BDs PETS extracted PETS reflected Attenuated forward
Attenuated reflected BD without reflection CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team ACS reflected ACS forward BD in the waveguide ACS transmitted Drive beam current No BD 4

5 PETS loop conditioning
PETS output peak power PETS Vacuum level Pulse length at 75% of pp Pulse length at 90% of pp CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team Number of BD Accumulated BDR * BD detection is based on the reflected power 5

6 PETS attenuator conditioning
Expected attenuated power PETS output peak power Pulse length at 75% of pp Pulse length at 90% of pp CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team Accumulated BDR Number of BD * BD detection is based on the missing energy 6

7 PETS2ACS waveguide conditioning
PETS output peak power Pulse length at 75% of pp Pulse length at 90% of pp CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team Accumulated BDR Number of BD * BD detection is based on the missing energy 7

8 Illustration of BDs PETS extracted PETS reflected Attenuated forward
Attenuated reflected BDs in the recirculation loop CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team ACS forward power ACS reflected No BDs in the waveguide ACS transmitted ACS Forward Phase High reflection from the ACS. Is it a BD in the ACS? 8

9 ACS conditioning Pulse length at 75% of pp Forward peak power
Accumulated BDR Number of BD * BD detection is based on the missing energy CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team Accumulated BDR Number of BD * BD detection is based on the missing energy, pulses with upstream BDs are excluded 9

10 ACS BD vs Acceleration Forward peak power Measured acceleration
CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team 113 MV/m 120 MV/m 127 MV/m 133 MV/m Accumulated BDR * BD detection is based on the missing energy, pulses with upstream BDs are excluded 105 MV/m 96 MV/m 10

11 ACS BDR vs Acceleration
CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team 11

12 The latest news from the last night
Successful run over the night with the stable beam conditions CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team 12

13 Conclusions The RF measurement has been improved, but not finished yet
The major number of BDs appear nearby the variable attenuator The BDR in the ACS is in the order of 10-3 at 100MV/m The TBTS night operation has been successfully established The future operation will continue the RF system conditioning and DBR measurement. CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team 13


Download ppt "CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team"

Similar presentations


Ads by Google