1 Some General Guidelines for the US TBM Costing
Cost for the Reference Case Cost is for the period between now and the shipment of the TBM deliverables (Test articles and ancillary equipment) in 2015 for DAY ONE ITER operation. The period is 10 years from 2006 to 2015 The cost is the total cost for the TBM project (based on the Reference designs/deliverables) including R&D, design, engineering, fabrication, qualification, etc., as well as the cost of interface with ITER and other parties. The deliverables are based on the Reference Designs described in the Design Summary Documents. The DCLL Reference Case has a PbLi exit temperature of 470ºC and a test module that occupies half a port. For the HCCB: submodule that has a size of 1/3 of one-half port and uses the EU (or Japan) first wall/box (first wall/box is not part of the US deliverables) The R&D Cost includes all costs related to the reference design that occur within the next 10 year period whether they are related to the first (Day ONE) Test Articles or subsequent test articles. But the Cost of the deliverables includes only the cost of the First Test Article and associated equipment. The US effort should take advantage of the R&D efforts in other parties. R&D performed by other parties and available to the US should, in general, not be duplicated by the US and should be costed separately. Cost estimates should state clearly what R&D done by the other parties is essential to the US TBM project.

2 Test Blanket “Project” Deliverables
DRAFT 1.8.1 DCLL Test Module Helium Flow Loop (primary) PbLi Flow Loop Tritium Processing Systems Secondary Helium Flow Loop (and Heat Exchanger for PbLi Flow Loop) 1.8.2 HCCB Test Submodule Ancillary Equipments (primary helium flow conditioners, measuring systems for helium, tritium, and test submodule)

3 US Test Blanket Work Breakdown Structure [DRAFT]
The R&D described in the WBS is required to gain critical REFERENCE case data required to design, fabricate and operate test module/submodules that achieve their experimental goals related to understanding simultaneous tritium generation and high grade heat extraction, as well as to satisfy ITER safety and qualification criteria. The R&D for the higher performance TBM is developed under TBM Base Program R&D.

4 Responsible person for base cost estimate for WBS Levels 3 and 4
Use template on slide 7 for base cost estimate Base cost estimate would include: Labor hours, rates Material and Equipment (procurements) Travel

5 1.8.1 DCLL Oct. base cost estimate to be filled by the proposed responsible person

6 HCCB Oct. base cost estimate to be filled by the proposed responsible person

7 Costing Input Table WBS Title: Provided by:
Use this sheet for base cost estimate One sheet for each WBS Level 6 or below WBS Title: Provided by:

8 draft

9 2005-2015 HCCB Schedule (DRAFT)