Presentation is loading. Please wait.

Presentation is loading. Please wait.

OMB Super Circular Big Changes for Nonprofits

Similar presentations


Presentation on theme: "OMB Super Circular Big Changes for Nonprofits"— Presentation transcript:

1 OMB Super Circular Big Changes for Nonprofits

2 OMB Super Circular Released 12/26/2013 2 years of study, 2 drafts
Goal: Better Management of Federal Funds 2 CFR Part 200

3 From 8 to 1 OMB Super Circular combines 8 grant related circulars into 1 document, supersedes current: A-133 A-110 & A-122 A-21, A-87 & A-89 A-102 Sections of A-50

4 Who? Super Circular applies to federal agencies that make federal awards to non-federal entities Flows down to sub-awards to sub recipients unless specifically excluded in Super Circular Nonfederal entities must comply with Super Circular regardless of whether they are recipients or sub recipients

5 Effective When? Effective on publication 12/26/2013
Federal agencies must release regulations 6/26/2014 Federal agencies must implement the Super Circular to be effective 12/26/2014 Audit requirements will apply to audits of fiscal years that start on or after 12/26/2014

6 Major Super Circular Changes
Audits – Audit expenses may not be charged to the grant as a direct cost (Federal nor non-Federal). The expenses may only be charged as an indirect cost. If audit expenses were included in your application as a direct cost, the budget MUST be revised to remove those costs and used for other allowable costs. Fundraising – Under – Fund- raising costs for the purposes of meeting the Federal program objectives are allowable with prior written approval from the Federal awarding agency.

7 Prior Written Approval 200.407
Now grouping of all prior approval requirements are in one regulation Absence of prior approval will not affect reasonableness or allocability determination unless prior approval was specifically required

8 Internal Controls Controls designed and implements to:
Prevent fraud, waste and abuse Protect personally identifiable information

9 Where to Find It Topic Page in NOA Circular Non-entity Responsibility
2 CFR Administrative Requirements and Post Federal ward Requirements Page 9 2 CFR Part 200, Sub Part D, Sub granting and Sub Contracting (Not Allowed) 2 CFR and Record Keeping Page 11 2 CFR Project Close Out Page 18 2 CFR Disposition of Equipment Page 19 Prior Approval Requirements 2 CFR

10 Where to Find It (con’t)
Topic Page in NOA Circular Cost Principles Page 26 2 CFR 200, Sub Part E Liability, Indemnification, Insurance Costs Page 27 2 CFR Indirect Costs Rate Agreements Page 28 2 CFR Matching Contributions Page 29 2 CFR Program Income Pages 30 and 33 2 CFR and 307


Download ppt "OMB Super Circular Big Changes for Nonprofits"

Similar presentations


Ads by Google