Presentation is loading. Please wait.

Presentation is loading. Please wait.

GETTING STARTED WITH LONWORKS

Similar presentations


Presentation on theme: "GETTING STARTED WITH LONWORKS"— Presentation transcript:

1 GETTING STARTED WITH LONWORKS
Topics: 1 – LonWorks Overview 2 – Hardware 3 – Labwork

2 Getting Started With LonWorks
EST: 40:00 1 – LonWorks Overview 2 – Hardware 3 – Labwork Module 2 Menu This module should take about 60 minutes. When you’ve completed this presentation on EC-gfxProgram Basics, click on the “QUIZ” button below to take a short quiz Then click the brown “NEXT MODULE” arrow below to advance to the next e-module – Module 3: Distech Controllers. Click to review Instructions >

3 LONWORKS OVERVIEW Topic 1
System Architecture LonWorks Controllers Application Matrix GETTING STARTED WITH LONWORKS Topic 1– Hosts In this topic, you will explore: What a host is Local vs. Remote hosts LONWORKS OVERVIEW Topic 1 BACK TO MENU

4 Typical Integrated System Architecture
BACK TO MENU 7

5 System Architecture – LonWorks
LONWORKS Controllers and Applications BACK TO MENU 8

6 LONWORKS Controllers Programmable and Configurable
Custom programmable controllers “ECP” and “ECL” Programmable with EC-gfxProgram in NiagaraAX or LNS Newest ECL series with fast-response 32-bit microprocessor for complex data processing Uses LONWORKS 2.0 with latest Neuron processors that support 255 network variables Configurable controllers “ECC” For terminal equipment control Configurable with EC-NetAX wizards or LNS based plug-ins Time saving product engineering tools All LONMARK Certified controllers Support of EC-Smart-Sensors or the newest EC-Smart-Vue, communicating sensors with LCD Support of Open-to-Wireless, wireless battery-less sensors and switches BACK TO MENU

7 LonWorks – Application Matrix
Central Plant Boilers Chillers Air Handling Units Roof Top Units Heat Pump Units Chilled Beams Fan Coil Units Variable Air Volume Boxes ECL-600 Series ECP-400 Series ECP-300 ECC-PFCU Series ECP-PTU Series EC-FCU-L EC-UV-L EC-RTU-L EC-HPU-L ECP-203 ECP-103 ECC-VAV Series ECP-VAV Series Terminal Application Air Handling Unit Central Plant BACK TO MENU

8 HARDWARE Topic 2 GETTING STARTED WITH LONWORKS 32-Bit Controllers
ECL-600 Series Extension Modules Open-to-Wireless Complimentary Products GETTING STARTED WITH LONWORKS Topic 1– Hosts In this topic, you will explore: What a host is Local vs. Remote hosts HARDWARE Topic 2 BACK TO MENU

9 Newest Line of 32-Bit Lon Controllers
Product Comparison Chart – Smart Source BACK TO MENU

10 ECL600 Series BACK TO MENU

11 ECL600 Series BACK TO MENU

12 ECL600 Series – ECx400 series ext modules
BACK TO MENU

13 ECL600 Series – Open to Wireless Add-on
BACK TO MENU

14 ECL600 – Complimentary Products
BACK TO MENU

15 Selecting the Right Controller/Vendor
A systems integrator must select the most appropriate device for each application, based on desired criteria: Size Mounting criteria Temperature/humidity features Interoperability Cost Documentation Support Maintenance requirements Availability BACK TO MENU

16 Selecting the Right Controller/Vendor
EC-BOS-3 EC-BOS-6 EC-BOS-7 EC-BOS Lon/Bacnet Controllers ECL/ECB VAV STAT EC-NETAX EC-gfx Software Wireless Solutions Distech Controls provides solutions to most, if not all, of these criteria. BACK TO MENU

17 LABWORK Topic 3 LAB 3: Getting Started With LonWorks
3A – Create Network 3B – Add/Discover/Match Devices 3C – Commission/Download 3D – Launch Wizard/Validate Connection LAB 3: Getting Started With LonWorks GETTING STARTED WITH LONWORKS Topic 1– Hosts In this topic, you will explore: What a host is Local vs. Remote hosts LABWORK Topic 3 BACK TO MENU

18 Lab 3: Getting Started With LonWorks
LAB 3 – 20 min Getting Started With Lonworks Controllers 20:00 Ideal for large control requirements, ranging from 28-points to 76-points (HW inputs/outputs) (support up two ECx-400 extension modules) Fast-response 32-bit microprocessor for complex data processing, including floating point support and math function execution, such as trigonometric and psychometric calculations Supports up to 255 network variables ECL-600/610/650 BACK TO MENU

19 Lab 3: Getting Started With LonWorks
ADD LON NETWORK ADD, DISCOVER, & MATCH DEVICE COMMISSION & DOWNLOAD LAUNCH WIZARD & VALIDATE CONNECTION BACK TO MENU

20 Lab 3: Getting Started With LonWorks - Lab Sections
LAB 3A – 5 min Create a BcpLonNetwork on the EC-BOS Station LAB 3B – 5 min Add, Discover & Match Lon Devices LAB 3C – 5 min Commission the Lon Device and Download LAB 3D – 5 min Launch Wizard on the Lon Device / Validate connection BACK TO MENU

21 Lab 3: Getting Started With LonWorks
LAB 3A – 5 min Add a BcpLonNetwork on the EC-BOS Station From the Distech Controls palette, add the BcpLonNetwork driver to your station. Or use the New button in the Driver Manager. BACK TO MENU BACK TO SECTIONS

22 Lab 3: A – Add a LonWorks Network
Add the BcpLonNetwork driver to the Drivers container of your EC-BOS station. Nav Tree BcpLonNetwork Palette sidebar distechControls palette BACK TO MENU BACK TO SECTIONS

23 Lab 3: Getting Started With LonWorks
LAB 3B – 5 min Add, Discover & Match Lon Devices From the Distech Controls palette, add a BcpLonworksDevice (generic Distech Controls GFX controller template) to your BcpLonNetwork. Select the specific device type/model (right-click command). Discover the devices (physical controllers) on your BcpLonNetwork. Match the discovered device (ECL-600) with the BcpLonworksDevice device in the station database BACK TO MENU BACK TO SECTIONS

24 Lab 3: B – Add, Discover & Match
Add a BcpLonworksDevice (generic Distech Controls gfx controller template) to your BcpLonNetwork. Nav Tree BcpLonDevice Palette sidebar distechControls palette BACK TO MENU BACK TO SECTIONS

25 Lab 3: B – Add, Discover & Match
Model Selector ECL-600Gfx Select the specific device type/model (right-click command). BACK TO MENU BACK TO SECTIONS

26 Lab 3: B – Add, Discover & Match
Discover the devices (physical controllers) on your BcpLonNetwork. b. Select discovered physical device Discover Pane BcpLonDevice (ECL-600) c. Select logical device in database Database Pane AHU-Lxx a. Select Discover button BACK TO MENU BACK TO SECTIONS

27 Lab 3: B – Add, Discover & Match
Match the discovered device (ECL-600) with the BcpLonworksDevice device in the station database. Discover Pane BcpLonDevice (ECL-600) BEFORE: Neuron ID is null Database Pane d. Select Match button AHU-L00 BACK TO MENU BACK TO SECTIONS

28 Lab 3: B – Add, Discover & Match
Match the discovered device (ECL-600) with the BcpLonworksDevice device in the station database. AFTER: Neuron ID is populated BACK TO MENU BACK TO SECTIONS

29 Lab 3: Getting Started With LonWorks
LAB 3C – 5 min Commission the Lon Device and Download Commission it, and rename it AHU_Lxx. Perform a Download Action on your new AHU_Lxx device and wait until you get a Success confirmation (or Upload Action in the case of an existing device). BACK TO MENU BACK TO SECTIONS

30 Lab 3: C – Commission & Download
Progress bar Apply Neuron ID Commission it, and rename it AHU_Lxx. Select Commission button BACK TO MENU BACK TO SECTIONS

31 Lab 3: C – Commission & Download
(Perform a Download Action on your new AHU_Lxx device and wait until you get a Success confirmation (or Upload Action in the case of an existing device)). Downloads any configurations performed offline to the new device. BACK TO MENU BACK TO SECTIONS

32 Lab 3: Getting Started With LonWorks
LAB 3D – 5 min Launch Wizard on the Lon Device and Validate the connection in EC-gfxProgram Launch the Wizard on your AHU_Lxx device (right-click command). This will launch the associated configuration wizard for your particular device (if the wizard is installed on the computer you are using). In this LAB, because the ECL-650 is a gpi programmable controller, the wizard that opens is EC- gfxProgram. In EC-gfxProgram, validate that you are online (live) on your controller (shows Connected in green). BACK TO MENU

33 Lab 3: D – Launch Wizard, Validate Connection
Launch the Wizard on your AHU_Lxx device (right-click command). BACK TO MENU

34 Lab 3: D – Launch Wizard, Validate Connection
ECgfxProgram is launched VALIDATE CONNECTION In the EC-gfxProgram, validate that you are online (live) on your controller (shows 2 green dots). BACK TO MENU

35 Requirements for Launch Wizard
EC-gfxProgram installed Support Pack (for EC-NETAX only) Distech Controls_EC-BOS-AX_...x.dist An installed Station database in AX TCP/IP access Station connection Wizard Service – auto-installed A programmable device (e.g., ECL/ECB/ECY) BACK TO MENU

36 Wizard Service Enabled by default
PORT 1931 Enabled by default Automatically installed when adding a Lon or BACnet device No configuration required Supports both Lon and Bacnet BACK TO MENU

37 Wizard Service – Legacy
PORT 1930 BACK TO MENU

38 Lab 3: Getting Started With LonWorks
ADD LON NETWORK ADD, DISCOVER, & MATCH DEVICE COMMISSION & DOWNLOAD LAUNCH WIZARD & VALIDATE CONNECTION BACK TO MENU

39 GETTING STARTED WITH LON
BACK TO GETTING STARTED WITH LON MENU (CLICK HERE)


Download ppt "GETTING STARTED WITH LONWORKS"

Similar presentations


Ads by Google