Presentation is loading. Please wait.

Presentation is loading. Please wait.

ERCOT CRR Update to CMWG

Similar presentations


Presentation on theme: "ERCOT CRR Update to CMWG"— Presentation transcript:

1 ERCOT CRR Update to CMWG
Carrie Bivens Manager, Forward Markets Monday, October 10, 2016

2 Discuss LTAS network model posting deadlines
Agenda CRR activity calendar Review options for next update, proposed format change and considerations for future updates CRR auction notices Proposed change in delivery and format Discuss LTAS network model posting deadlines Review two clarification NPRRs NPRR805 NPRR806

3 CRR activity calendar - Overview
ERCOT is proposing to update the calendar to cover CRR activities through early 2019 Would like to review the draft calendar with CMWG and ask for their endorsement of an update The LTAS Seq3 and 4 auctions are always tricky to schedule around the end of year holidays Would like to discuss options to determine what is preferred for 2017 and beyond Proposed format changes Possible need to review protocol language (section 7.5.1(4)(b)(iii))

4 CRR activity calendar – description of changes
Dates from the currently approved calendar remain unchanged (through 2018.FEB.Monthly.Auction) Except for adjustments to PCRR dates for 2017 (moved back by 2 weeks) Added dates to cover CRR activity into beginning of 2019 (through 2019.MAR.Monthly.Auction) and PCRR dates for 2018 The same date selection patterns as used for previous years were applied to the draft to maintain Protocol requirements and consistency

5 CRR activity calendar – options for delaying Seq3 & 4 auctions around end of year holidays
Since beginning of LTAS auctions, it has always been difficult to schedule around end of year holidays Staffing concerns for market participants and for ERCOT Draft calendar contains multiple options for Seq3 & 4 auctions Schedule right in line with previous auctions Delay Seq3 by 2 weeks to avoid opening bid window soon after Jan. 1 (Seq4 to follow as usual) Delay Seq3 until Jan (Seq4 to follow as usual) Delaying auctions would have no impact on other auctions and would not impact ERCOT’s annual PCRR model build Hope to choose the preferred option today

6 CRR activity calendar – proposed format change
Remove “Transaction Adjustment Period” column Has only happened once (an annual auction in Oct. 2011) An automated MIS operator message is posted right after the close of every auction bid window to notify whether or not a transaction adjustment period is needed If needed, a Market Notice and a follow-up operator message would be sent Would eliminate some clutter on the calendar

7 CRR activity calendar – next steps
ERCOT would like to get decisions today on preferred options for Seq3 & 4 auctions around end of year holidays and whether or not to remove “Transaction Adjustment Period” column from calendar If decisions are reached, ERCOT plans to take the proposed calendar to WMS for endorsement on October 17 or November 2, 2016 And, then to TAC for final approval on October 27 or December 1, 2016

8 CRR activity calendar – considerations for future updates
Is there a need to review the calendar requirements in Section 7.5.1(4)(b)(iii-iv)? Current language is a little confusing Is TAC approval still needed for calendar updates? If not, which group should approve? Add column for “Pull Outage and NOMCR Data” Provide specific date on which model builder will begin the process by pulling outage and NOMCR data Use approved outages and NOMCRs for equipment changes available on this date

9 CRR auction notices ERCOT Market Support Services is looking into ways to reduce Market Notice traffic Cut down on distribution lists and extraneous notices CRR team proposes no longer sending version of auction notices Not required by protocol to send Market Notice Auction Notice zip file posted on MIS Public meets all protocol requirements Additionally, propose replacing current Word document in the zip file with a table of relevant auction information Easier to read and cuts out unnecessary language Is CMWG in agreement with these changes?

10 LTAS network model posting deadlines
Currently required by protocol to post no later than 20 business days before the auction (measured from bid window open date) Is 20 business days still the desired timing? Should we consider changing to 10 business days to match requirement for monthly auction network models? Would allow for 2 more weeks to gather approved outages and NOMCRs Is this worth losing 2 weeks to analyze the posted model? Change would require an NPRR ERCOT is seeking CMWG input

11 NPRR805 – Clarification for Multi-Month CRR Auction Offers
Clarifies that multi-month offers can be submitted into LTAS auctions, if the following conditions are met: Strip of consecutive months Months are within the auction period Only for an LTAS auction No change to current practice, just getting language into protocol No impact NPRR

12 NPRR806 – Clarification for Designation of Capacity or Refund PCRRs
For annual PCRR nominations, clarifies how NOIEs are to designate whether they want to accept the refund option or the capacity option for their eligible resources Choice is for entire year Cannot select one option (refund or capacity) for some months of the year and the other option for the remaining months Required because there is a 40% capacity factor applied over the entire year when that option is chosen No change to current practice, just getting language into protocol ahead of CRR framework upgrade which will automatically populate the selected designation for every month of the year No impact NPRR


Download ppt "ERCOT CRR Update to CMWG"

Similar presentations


Ads by Google