Presentation is loading. Please wait.

Presentation is loading. Please wait.

CCAMP Working Group Status

Similar presentations


Presentation on theme: "CCAMP Working Group Status"— Presentation transcript:

1 CCAMP Working Group Status
Chairs: Lou Berger Deborah Brungard Secretary: Dan King 81st IETF CCAMP WG 1

2 Document Status – RFCs Recent RFCs: In RFC Editor’s Queue:
RFC 6163: Framework for GMPLS and Path Computation Element (PCE) Control of Wavelength Switched Optical Networks (WSONs) RFC 6205 Generalized Labels for Lambda- Switch-Capable (LSC) Label Switching Routers In RFC Editor’s Queue: draft-ietf-ccamp-mpls-tp-cp-framework-06 draft-ietf-ccamp-gmpls-vcat-lcas-13 81st IETF CCAMP WG 2

3 Document Status – IESG Processing
draft-ietf-ccamp-asymm-bw-bidir-lsps-bis- 02 81st IETF CCAMP WG 3

4 Document Status – Post WG Last Call
draft-ietf-ccamp-gmpls-ted-mib 2nd LC completed Document updated Changes to be reviewed on list draft-ietf-ccamp-attribute-bnf Waiting on chairs for Proto write-up draft-ietf-ccamp-wson-impairments 81st IETF CCAMP WG 4

5 WG Drafts on the Agenda draft-ietf-ccamp-assoc-ext
draft-ietf-ccamp-assoc-info draft-ietf-ccamp-gmpls-g709-framework draft-ietf-ccamp-lmp-behavior-negotiation draft-ietf-ccamp-mpls-tp-rsvpte-ext-associated-lsp draft-ietf-ccamp-oam-configuration-fwk draft-ietf-ccamp-otn-g709-info-model draft-ietf-ccamp-rfc5787bis draft-ietf-ccamp-rsvp-te-eth-oam-ext draft-ietf-ccamp-rsvp-te-mpls-tp-oam-ext draft-ietf-ccamp-rsvp-te-sdh-otn-oam-ext draft-ietf-ccamp-rwa-info draft-ietf-ccamp-rwa-wson-encode 81st IETF CCAMP WG

6 WG Drafts Not on Agenda Ready for LC? Waiting on authors
draft-ietf-ccamp-dpm Waiting on authors draft-ietf-ccamp-general-constraint-encode draft-ietf-ccamp-gmpls-general-constraints- ospf-te draft-ietf-ccamp-rsvp-resource-sharing draft-ietf-ccamp-wson-signal-compatibility-ospf draft-ietf-ccamp-wson-signaling 81st IETF CCAMP WG 6

7 Liaisons and Communications
ITU-T SG 15 (optical control plane) Sent : The IETF CCAMP working group last call on "A Framework for the Control of Wavelength Switched Optical Networks (WSON) with Impairments" Sent : Request for review of OSPFv2 extensions for ASON Routing Received : Liaison response to request for review of OSPFv2 extensions for ASON routing submission (ref. TD 552 (WP 3/15)) Pending action: authors to propose response to identified unsupported requirements General comment Please review proposed and incoming documents and comment on 81st IETF CCAMP WG 7

8 MPLS-TP MPLS-TP work continues Joint work
MPLS WG PWE3 WG CCAMP WG L2VPN WG OPSA WG Joint meetings to discuss MPLS-TP Appear as “MPLS” on the agenda Covers all I-Ds for all working groups 81st IETF CCAMP WG 8


Download ppt "CCAMP Working Group Status"

Similar presentations


Ads by Google