Presentation is loading. Please wait.

Presentation is loading. Please wait.

DETACHMENT PEARL HARBOR

Similar presentations


Presentation on theme: "DETACHMENT PEARL HARBOR"— Presentation transcript:

1 DETACHMENT PEARL HARBOR
CBMU 303 DETACHMENT PEARL HARBOR RIMPAC 2014 HA/DR

2 Capabilities Engineer Support Peronnel
BUILDERS- assists with camp establishment , vertical and horizontal construction. ELECTRICIANS- assists with temporary power supply, and Camp maintenance support. EQUIPMENT OPERATORS- operate light and heavy civil engineering support equipment(CESE) . UTILITIESMAN- water purification systems and heating and cooling. Equipment Two 11k forklift- moving pallets, and containers. Three ½ ton flatbed trucks- transport cargo, and equipment. Two tractor Trailers- transport equipment and cargo. Bulldozer- move debris and road clearing.

3 Limitations Communication equipment Large amount of personnel
Large number CESE

4 Mahalo nui loa Questions?


Download ppt "DETACHMENT PEARL HARBOR"

Similar presentations


Ads by Google