1
General Permits and General Operating Permits under construction
September 2017
2
New General Permits (GP/GOP) Approved in 2017
No. General Permits Comments Status GP-017A Boiler(s) and Heater(s) each less than 5 MMBTU per hour Revised to implement MACT 6’Js for Industrial, Commercial and Institutional boilers. This GP replaced the existing GP-017. Effective Date: March 20, 2017 GP-018A Boiler(s) and Heater(s) each greater than or equal to 5 MMBTU per hour and less than 10 MMBTU per hour To implement MACT 6’Js for Industrial, Commercial and Institutional boilers. This GP replaced the existing GP-018. August 07, 2017 September /2017 |Division of Air Quality | NJDEP
3
General Permits (GPs) under Construction
No. General Permits Comments Status GP-004B Fuel Dispensing facilities for Stage I only To revise this GP to be in accordance with the revised regulation, Subchapter, 16.3 for Gasoline Transfer Operations. This rule will eliminates the installation of Stage II Vapor recovery system in Gas Stations. Developing General permit. Availability date: Beginning of 2018 GP-016A Manufacturing and Materials Handling Equipment (Former SEGAP) To revise this GP to make it more flexible and friendly use. This GP will replace three existing GPs: GP-016, SEGAP GP-002, Confined Abrasive Blasting Equipment GP-003, Woodworking Equipment Developing online design. Availability date: Dec 4, 2017 September /2017 |Division of Air Quality | NJDEP
4
General Permits (GPs) under Construction
No. General Permits Comments Status GP-015A Non MACT Plating Operations To revise the existing GP name eliminating misinterpretation of applicability and to implement MACT requirements This GP will replace GP-015. Permit text and compliance plan under development GP-009B Boiler(s) and Heater(s) each greater than or equal to 10 MMBTU per hour and less than 50 MMBTU per hour To implement MACT 6’Js for Industrial, Commercial and Institutional boilers burning No.2 Fuel oil. To include Boilers burning No.2 fuel oil Automatic PTE calculations This GP will replace the existing GP-009A. Effective Date: Beginning / mid 2018 September /2017 |Division of Air Quality | NJDEP
5
General Permits (GPs) under Construction
No. General Permits Comments Status GP-019A Portable Equipment To simplify and incorporate Subchapter 8 changes and allows multiple equipment. This GP will replace GP-019. TBD GP-008A Site Remediation Activities for Gasoline Contamination at Vehicle Fueling Stations (SVE) To revise it and make it available for five years only; That would eliminate the existing several versions of GP-008 September /2017 |Division of Air Quality | NJDEP
6
General Operating Permits (GOP) Approved
No. General Permits Comments Status GOP-008 Boiler or Heater greater than or equal to 5 MMBTU per hour and less than 10 MMBTU per hour New GOP to implement MACT 6’Js for Industrial, Commercial and Institutional boilers. Effective Date: August 07, 2017 September /2017 |Division of Air Quality | NJDEP
7
General Operating Permits (GOP) under Construction
No. General Permits Comments Status GOP-002A Manufacturing and Materials Handling Equipment (Former SEGAP) To revise it and make it more flexible and friendly use. This GOP will replace existing GOP-002, SEGAP. The comment period ended on: April 20, 2017 Working on online design GOP-009 Boiler OR Heater each greater than or equal to 10 MMBTU per hour and less than 50 MMBTU per hour To implement MACT 6’Js for Industrial, Commercial and Institutional boilers burning No.2 Fuel oil. To include Boiler or Heater burning No.2 fuel oil Automatic PTE calculations Effective Date: Beginning / mid 2018 September /2017 |Division of Air Quality | NJDEP
8
Contact Information General Permit Help Line (609) General Operating Permit Help Line (609) September /2017 |Division of Air Quality | NJDEP