Presentation is loading. Please wait.

Presentation is loading. Please wait.

Figure 1. Rate of Return Systems.

Similar presentations


Presentation on theme: "Figure 1. Rate of Return Systems."— Presentation transcript:

1 Figure 1. Rate of Return Systems.
From: Oil and gas contracts utilizing R Factors and rates of return: theory and practice J World Energy Law Bus. Published online July 28, doi: /jwelb/jwx021 J World Energy Law Bus | © The Authors Published by Oxford University Press on behalf of the AIPN. All rights reserved.

2 Figure 3. Sonatrach share of 2008 Net Cash Flow from a particular field under a variety of different terms, before and after TPE. From: Oil and gas contracts utilizing R Factors and rates of return: theory and practice J World Energy Law Bus. Published online July 28, doi: /jwelb/jwx021 J World Energy Law Bus | © The Authors Published by Oxford University Press on behalf of the AIPN. All rights reserved.

3 Figure 2b. R Factor Systems—Malaysia—Turkmenistan.
From: Oil and gas contracts utilizing R Factors and rates of return: theory and practice J World Energy Law Bus. Published online July 28, doi: /jwelb/jwx021 J World Energy Law Bus | © The Authors Published by Oxford University Press on behalf of the AIPN. All rights reserved.

4 Figure 2a. R Factor Systems—Algeria—Libya.
From: Oil and gas contracts utilizing R Factors and rates of return: theory and practice J World Energy Law Bus. Published online July 28, doi: /jwelb/jwx021 J World Energy Law Bus | © The Authors Published by Oxford University Press on behalf of the AIPN. All rights reserved.

5 Figure 4. Cost Savings Index, 20MMSTB Field, US$50/STB Oil Price, after van Meurs.
From: Oil and gas contracts utilizing R Factors and rates of return: theory and practice J World Energy Law Bus. Published online July 28, doi: /jwelb/jwx021 J World Energy Law Bus | © The Authors Published by Oxford University Press on behalf of the AIPN. All rights reserved.

6 Figure 5. Contractor NPV10, MM US$ and Contractor Investment Efficiency (Contractor NPV/NPV of Contractor’s Capital Costs) superimposed on CSI data from Figure 4. From: Oil and gas contracts utilizing R Factors and rates of return: theory and practice J World Energy Law Bus. Published online July 28, doi: /jwelb/jwx021 J World Energy Law Bus | © The Authors Published by Oxford University Press on behalf of the AIPN. All rights reserved.

7 Figure 6. Cost Savings Index, 50MMSTB Field, US$50/STB Oil Price.
From: Oil and gas contracts utilizing R Factors and rates of return: theory and practice J World Energy Law Bus. Published online July 28, doi: /jwelb/jwx021 J World Energy Law Bus | © The Authors Published by Oxford University Press on behalf of the AIPN. All rights reserved.

8 Figure 7. Contractor Full Cycle NPV10 for a range of oil prices assuming the investment decision was made on the basis of a $50/STB price forecast. From: Oil and gas contracts utilizing R Factors and rates of return: theory and practice J World Energy Law Bus. Published online July 28, doi: /jwelb/jwx021 J World Energy Law Bus | © The Authors Published by Oxford University Press on behalf of the AIPN. All rights reserved.


Download ppt "Figure 1. Rate of Return Systems."

Similar presentations


Ads by Google