Presentation is loading. Please wait.

Presentation is loading. Please wait.

FCC R&D WP5 Cavity Fabrication Status and Plans Dec-16

Similar presentations


Presentation on theme: "FCC R&D WP5 Cavity Fabrication Status and Plans Dec-16"— Presentation transcript:

1 FCC R&D WP5 Cavity Fabrication Status and Plans Dec-16
06/10/2016 M. Karppinen BE-RF-SRF

2 Objective Development of new cavity fabrication methods suitable for production of large series of SC cavities based on thin film and bulk Nb technologies 06/10/2016 M. Karppinen BE-RF-SRF

3 WP 5: Scope WU 5.1 (C. Abajo Clemente CERN):
Copper and Niobium sheet supply WU 5.2 (M. Karppinen CERN, V. Palmieri LNL) Fabrication of seamless cavities WU 5.3 (G. Favre CERN, TBD BMAX): High velocity forming of SC RF structures 06/10/2016 M. Karppinen BE-RF-SRF

4 WU 5.1: Cu- and Nb-sheet Supply
Specification, characterization, handling, and supply of copper and niobium sheets for the cavity forming development: Task 1: Collection of technical specifications for the sheet metal to be used for cavity forming studies; Task 2: Procurement of Cu- and Nb-sheets; Task 3: Processing of the sheets including the heat treatments, chemical processing, and cutting to requred size; Task 4: Material characterisation at appropriate stages ranging from material reception to samples extracted from formed cavities; Task 5: Quality assurance related to the sheet metal supply to ensure the conformance with the technical specification and the traceability. 06/10/2016 M. Karppinen BE-RF-SRF

5 WU 5.2: Fabrication of Seamless Cavities
Development and validation of seamless cavity forming technology for multi-cell 800 MHz and mono-cell 400 MHz Cu-cavities Task 1: Manufacturing drawings Task 2: Material supplied by CERN Task 3: Fabrication 800 MHz mono-cell cavity Task 4: Fabrication 800 MHz 2-cell cavity Task 5: Fabrication 400 MHz mono-cell cavity 06/10/2016 M. Karppinen BE-RF-SRF

6 WU 5.3 High Velocity Forming of SC RF-Structures
Objectives: Thorough understanding of the electro-hydraulic forming process applied to elliptical copper and niobium cavities for superconducting RF structures. Characterisation and modelling of copper and niobium for fast forming. Production of a niobium functional structure. Task 1: Manufacturing drawings Task 2: Numerical modelling of 800 MHz half-cells Task 3: Forming of 800 MHz Cu and Nb half-cells Task 4: Fabrication of cut-off tubes Task 5: Assembly of mono-cell 800 MHz Cu-cavity Task 6: Assembly of mono-cell 800 MHz Nb-cavity 06/10/2016 M. Karppinen BE-RF-SRF

7 Manpower & Budget: Initial Guesstimate
06/10/2016 M. Karppinen BE-RF-SRF

8 Open questions Cut-off tube fabrication
Chemical processing of sub-assemblies and completed cavities Continue with 704 MHz development or start 800 MHz (WU 5.3) 06/10/2016 M. Karppinen BE-RF-SRF

9 Next steps Confirm the tasks and deliverables Cost-estimate vs. budget
Visit to LNL Jan-17 Cost-estimate vs. budget Establish project schedule and milestones Finalise and approve WP 5 description 06/10/2016 M. Karppinen BE-RF-SRF


Download ppt "FCC R&D WP5 Cavity Fabrication Status and Plans Dec-16"

Similar presentations


Ads by Google