1 Water Quality Committee – March 8, 2017
Update on Water Quality Program Rules in 15A NCAC 02B, 02H, 02T, and 02U Jeff Manning

2 DWR

3 Update A number of rules are under review:
Rules 15A NCAC 02B, 02H, 02T, 02U The “water quality program” rules (~375 rules) HB74 review completed in Dec 2014 – determined the need to readopt the rules. Stakeholder input in 2015 (see next slide). DEQ review in 2016. WQC - March 2017 as information item. All rule drafts posted online in April 2017. WQC - May 2017 as action item on some (02T, 02U, and 02H .0800) After WQC approves draft language, then we proceed with regulatory impact analysis, fiscal note. Then, EMC approves drafts (as early as July).

4 Session Law 2013-213 (HB 74) Rule Review done
Results of HB74 Review: Administrative Code Subchapter Title Final determination 15A NCAC 02B Surface Water and Wetland Standards Necessary with substantive public interest 15A NCAC 02H Procedures for Permits: Approvals 15A NCAC 02T Waste Not Discharged to Surface Waters 15A NCAC 02U Reclaimed Water

5 Stakeholder meetings in 2015
Date Time Rules Covered March 24 Morning 2B 0100, 0200, 0300 Standards & Classification Rules Afternoon 2H 1100 Biological Cert Rule; 2H 0800 Lab Cert Rules; April 7 2H 0400, 0500; 2H 100, 400, 900, 1200 WW npdes rules 2T 1300, 1400 Animal rules April 21  2U Reclaimed water; and 2T WW rules 2T residuals rules (1100, 1200, 1500, 1600) May 5 2B, 2H water supply watershed program 2B Buffer Rules Continue 2B Buffer Rules 2H 0500, wetlands May 19 2B NSW Strategy Rules Trading & Nutrient Offset, Tar-Pam Non-Association Dischargers & BMP Rate, Definitions, Fertilizer Management, Goals 2B NSW Strategy Rules: New Development Existing Development State/Federal Stormwater, Agriculture

6 Subchapter 02B- Surface Water and Wetland Standards
Section Procedures For Assignment Of Water Quality Standards Section Classifications And Water Quality Standards Applicable To Surface Waters And Wetlands Of North Carolina Section Assignment Of Stream Classifications (.0311 amendment pending leg. Review) Section Effluent Limitations Section Surface Water Monitoring: Reporting Section Water Quality Management Plans (Moving some rules from .0200) Section Nutrient Management Strategies (Moving some rules from to this new section)

7 Summary of Key Revisions 02B
Summary of Key Revisions 02B Buffer Rules (Water Supply, Catawba, Goose Creek, Neuse, Tar-Pam, Randleman) All Buffer Rules Overhauled rules for consistency Revised diffuse flow requirement & include options for stormwater Incorporated applicable session laws, clarification memos and EMC interpretative ruling Modified variance hardships and procedure for major variance Water Supply Move from 2B Standards to 2B – organizational. Updates to match new stormwater rules Adds definitions for clarity Changes include more flexibility Neuse, Tar-Pam, Randleman Consolidated into one rule: Definitions Forestry Approvals (buffer authorizations and variances) Added provisions for single family residences on existing lots Zone 2 impacts – allowable (per SL’s) Zone 1 impacts – allowable with mitigation

8 Summary of Key Revisions. 02B
Summary of Key Revisions .02B Nutrient Strategy Rules (Neuse, Tar-Pam, Randleman, Falls, Jordan) New Development Stormwater Added named communities - Neuse & Tar-pam Added one BMP minimum - Neuse & Tar-Pam Added regional BMP option Updated redevelopment requirements per SL Nutrient Offset Reset the funding requirement to the life (duration) of practice (removes an arbitrary 30-year operation funding requirement) Agriculture Rules Updated rule dates – Neuse & Tar-Pam Added practice standard requirements for Ag BMPs

9 SL 2016-94 – “2016 Appropriations Act”
The Falls (.0275 through .0282) and Jordan Rules (.0262 through .0273) are on their own readoption timeline per Session law and will not be on the same schedule as the other 2B rules.  Please note that the Cape Fear and Neuse Classification Rules and are also specifically named in the Falls / Jordan Session Law and will also follow the timeline for the Falls and Jordan readoption per the Session Law.

10 In 2B: Neuse, Tar-Pam, Randleman Rules These are ready to go forward (not affected by SL ) -some move, -some repealed Neuse .0232     Goals Rule .0233     Buffer Protection      Wastewater .0235     New Development .0236     Ag Goals (repeal) .0238     Agriculture .0239     Nutrient Management (repeal) .0240     Nutrient Offset .0241     Buffer Delegation Tar-Pam .0229     Non-Association      BMP Rate (repeal) .0255     Ag Goals (repeal) .0256     Agriculture .0257     Nutrient Management (repeal) .0258     New Development .0259     Buffer Protection .0261     Buffer Delegation Randleman Lake .0248 Purpose and Scope .0249 Wastewater .0250 Buffer Protection .0251 Stormwater Nutrient Offset .0240     Goals Rule New Rules Definitions Tar-Pam Purpose and Scope

11 Subchapter 02H- Procedures For Permits: Approvals
Section Point Source Discharges To The Surface Waters Section Coastal Waste Treatment Disposal Section Water Quality Certification Section Laboratory Certification Section Local Pretreatment Programs Section Stormwater Management (Completed) Section Biological Laboratory Certification Section Special Orders Section Discharges To Isolated Wetlands And Isolated Waters

12 Summary of Key Revisions 02H. 0500 Water Quality Certification and 02H
Summary of Key Revisions 02H.0500 Water Quality Certification and 02H.1300 Isolated Wetland Rules Both (2H .0500) 401 WQC and (2H .1300) IWP Rules Updated and reorganized Removed paper mailing list (will use listserv) Updated mitigation language Reference federal definitions Codify trigger for stream impacts Remove unused ratios Remove requirement for 1:1 restoration or creation Isolated Wetland Rules (02H .1300) Incorporated changes required in SL and SL

13 Summary of Key Revisions 02H .0800 Laboratory Certification
List of Certifiable Parameters Appended the list to include 24 additional parameters Added 7 additional parameters to the Field Parameter definition Quality Control (QC) Requirements Making improvements and Adding clarity to the requirements Codifying electronic data storage requirements Changes to the Fee Schedules Will increase fees, supported by fee payers, program provides support to labs Miscellaneous Changes Expands allowable supervisor credentials for Field Labs Definitions added for clarity

14 Subchapter 02T - Waste Not Discharged To Surface Waters
Section General Requirements Section Wastewater Pump and Haul Systems Section Sewer Extensions Section System-Wide Collection System Permitting Section Wastewater Irrigation Systems Section Single-Family Residence Wastewater Irrigation Systems Section High Rate Infiltration Systems Section Other Non-Discharge Wastewater Systems Section Closed–Loop Recycle Systems Section Residuals Management Section Coal Combustion Products Management Section Animal Waste Management Systems Section Manure Hauler Operations Section Soil Remediation (DWM) Section Groundwater Remediation Systems (future incorporation into 02C rules)

15 Summary of Key Revisions .02T .1300 Animal Waste Management Systems
02T – Modifies definition of New Animal Waste Management System to comply with Session Law and Requires cattle facilities that have had permits rescinded but then increase above permitting threshold to be considered a new operation. Changes the definition of “New” from abandoned/unused for 4 years or more to being abandoned/unused for 5-10 years (unless certain conditions are met) or for more than 10 years. 02T .1304/.1305 – Include long standing fundamental permit language. Include existing setbacks from NRCS Standards (no new effects). 02T – Adds specific language to allow cattle facilities to have permit rescinded prior to closure of waste treatment and storage structures.  This modification was made to comply with House Bill 74 (Session Law ). 02T – The rule was added for Distribution of Animal Waste Residuals.  When the 02T rules were implemented, this practice was inadvertently omitted in the rules.  This addition is to correct that omission.

16 Summary of Key Revisions .02T .1400 Manure Hauler Operations
02T Repeal rules requiring the submission of annual reporting and add the recordkeeping requirements to 02T Eliminates unnecessary reporting submittals/records are still maintained. The records verify proper waste application.

17 Subchapter 02U - Reclaimed Water
Section General Requirements Section Application Requirements Section Effluent Standards Section Design Standards Section General Utilization Requirements Section Bulk Distribution of Reclaimed Water Section Setbacks Section Operational Plans Section Local Program Approval Section Wetlands Augmentation Section Irrigation to Food Chain Crops

18 Coming in April 2017 – rules website
Display all 4 (2B, 2H, 2T, 2U) subchapter drafts. Show changes as strikethrough/underline. All changes will include comment boxes, explain proposed edits & expected effects. Will show path through WQC, EMC, Hearing, RRC Location: Will hold Information Sessions for Stakeholders: April 19th & 26th, :30am-12:30pm. GFCR

19 Summary - Next Steps for 2B, 2H , 2T, 2U – Water Quality Program Rules
15A NCAC 02B, 02H, 02T, 02U - All drafts to be posted online & info sessions in April The “water quality program” rules (~375 rules) MAY 10, 2017, bring draft rules to WQC 02T (non-discharge), 02U (reclaimed water) and 02H (lab certification). Following WQC approval of the language, proceed with regulatory impact analysis, fiscal note. Proceed to EMC for approval of drafts for hearings/FN if required. Public Hearings, followed by Hearing Officer recommendations to EMC (rule adoption).

20 Summary & Next Steps for 2B, 2H , 2T, 2U – Water Quality Program Rules
On SEP 13, 2017, bring the 02B (standards and discharge)(but not Jordan/Falls) and remaining 02H to WQC Following WQC approval of the language, will proceed with regulatory impact analysis, fiscal note. Proceed to EMC for approval of drafts for hearings. Public Hearings, followed by Hearing Officer Recommendations for EMC (rule adoptions).

21 More Rules Reviews Session Law 2013-213 (HB 74) Update
Rules under 02A, 02C, and 02E just completed the “initial determination” review – determined need to readopt. Will begin readoptions in 2017 2A-(EMC organization) 2C-(Well Construction Standards) (will inc 2T gw re) 2E-(Water Use Registration and Allocation) Initiate HB 74 review of the 02L (groundwater standards, risk-based UST/AST rules, ) rules begins in May 2017 at GWWMC Modifications/adoptions of ground water standards will be aligned as closely as possible to this review (including IMACs)

22 2B, 2H, 2T, 2U Summary Schedule Action / Request Date
WQC – update (today) March 8, 2017 WQC action on drafts 2T, 2U, & 2H only May 10, 2017 EMC approves drafts 2T, 2U for hearing (no fiscal note expected) (Maybe 2H with FN) July 13, 2017 WQC action on drafts 2B, 2H (except Jordan/Falls) September 10, 2017 EMC approves drafts 2H and fiscal note for hearing September 11, 2017 (maybe July?) Department of Environmental Quality