1 A WORLD PRESENCE IN THE FIELD OF WATER
LE RESERVOIR MASSAL FAYAT GROUP A WORLD PRESENCE IN THE FIELD OF WATER

2 ACTIVITIES Boiler making : range of product
LE RESERVOIR MASSAL FAYAT GROUP ACTIVITIES Boiler making : range of product Tanks for compressed air Expansion tanks Galvanized tanks with or without bladder Tanks for the pressure maintenance Anti water-hammer tanks with bladder for potable water Anti water-hammer tanks with bladder and self aerating tanks for waste and rain water

3 LE RESERVOIR MASSAL COMPRESSED AIR FAYAT GROUP

4 LE RESERVOIR MASSAL GALVANISED TANK FAYAT GROUP

5 LE RESERVOIR MASSAL VAPOR TANK FAYAT GROUP

6 ANTI WATER-HAMMER TANK
LE RESERVOIR MASSAL ANTI WATER-HAMMER TANK FAYAT GROUP

7 LE RESERVOIR MASSAL MANUFACTURE ISO 9001 V2000
FAYAT GROUP MANUFACTURE ISO 9001 V2000 Manufacture in conformity with the European Directive 97/23/CE Thickness calculation according to CODAP 2000 Capacity from 0 to L Pressure from 0 to 100 bar

8 MATERIALS Steel ALL MATERIALS used for the MANUFACTURE of the ENCLOSURES UNDER PRESSURE ARE IN CONFORMITY WITH EUROPEAN DIRECTIVE D.E.S.P. 97/23/CE Material used for the vessel: P265GH

9 ROLLING OF A SHELL IN Ø3000 AND 35 mm
LE RESERVOIR MASSAL FAYAT GROUP A TANK ASSEMBLY ROLLING OF A SHELL IN Ø3000 AND 35 mm

10 70 M3 TANK DURING THE MANUFACTURING
LE RESERVOIR MASSAL FAYAT GROUP ASSEMBLY OF A TANK 70 M3 TANK DURING THE MANUFACTURING

11 LE RESERVOIR MASSAL HYDRAULIC TEST FAYAT GROUP

12 LE RESERVOIR MASSAL MATERIALS BLADDERS FOR THE TANKS UNTIL 500 L :
FAYAT GROUP MATERIALS BLADDERS FOR THE TANKS UNTIL 500 L : Bladder in EPDM FOR THE 750 L TANKS AND MORE : Bladder in polyurethane

13 REALISATION OF A BLADDER IN POLYURETHANE
LE RESERVOIR MASSAL FAYAT GROUP REALISATION OF A BLADDER IN POLYURETHANE

14 REALISATION OF A BLADDER IN POLYURETHANE
LE RESERVOIR MASSAL REALISATION OF A BLADDER IN POLYURETHANE FAYAT GROUP

15 ANTI-CORROSION PROTECTION
LE RESERVOIR MASSAL FAYAT GROUP ANTI-CORROSION PROTECTION - Hot galvanisation in option up to 4500 litres ( 1250) - Painting after sandblasting for all capacity Internal : Epoxy External : Epoxy Finishing lacquer

16 LE RESERVOIR MASSAL FAYAT GROUP

17 LE RESERVOIR MASSAL EQUIPEMENTS Visual level Magnetic level
FAYAT GROUP EQUIPEMENTS Visual level Magnetic level Weight controller « Mas-Control »

18 LE RESERVOIR MASSAL FAYAT GROUP VISUAL LEVEL

19 LE RESERVOIR MASSAL MAGNETIC LEVEL FAYAT GROUP

20 LE RESERVOIR MASSAL WEIGHT CONTROLLER FAYAT GROUP

21 ACTIVITIES INGINEERING
LE RESERVOIR MASSAL FAYAT GROUP ACTIVITIES INGINEERING UPSTREAM : Definition of the material with the bulding site master At the invitation bids : Definition of the material with the society answered at the tender

22 LE RESERVOIR MASSAL THE ANALYSIS Hydraulic calculations softwares
FAYAT GROUP THE ANALYSIS Hydraulic calculations softwares All of our hydraulic studies are free: Calculation of regulation Calculation of pressure maintenance Calculation of accumulation Anti water-hammer calculation

23 Anti water-hammer calculation
LE RESERVOIR MASSAL Anti water-hammer calculation FAYAT GROUP Elements necessary to realize calculation: Maximum flow Hydraulic profile Inside diameter of the pipeline Nature of the pipeline Nature of the water

24 CALCULATION OF REGULATION
LE RESERVOIR MASSAL FAYAT GROUP CALCULATION OF REGULATION Elements necessary to realize calculation: Pressure at the pump start Flow at the pump start Pressure at the pump stop Flow at the pump stop Number of acceptable time starting (according to the number of pumps, these data have to be communicated for each pump)

25 LE RESERVOIR MASSAL FAYAT GROUP CALCULATION WITHOUT PROTECTION ALLIEVI Formula : H = (celerity x speed) / 9,81 Max. Pression + H Geometric height Min. Pression - H

26 LE RESERVOIR MASSAL ARRIVAL AT THE PUMP CHECK VALVE
FAYAT GROUP ARRIVAL AT THE PUMP CHECK VALVE ATMOSPHERIC PRESSURE ARRIVAL Normal functioning Pump Stop DEPRESSION PROPAGATION OF THE WAVE PROPAGATION OF THE WAVE

27 LE RESERVOIR MASSAL ATMOSPHERIC PRESSURE ARRIVAL SURPRESSION
FAYAT GROUP ATMOSPHERIC PRESSURE ARRIVAL SURPRESSION PROPAGATION OF THE WAVE PROPAGATION OF THE WAVE

28 Amortisation of the water-hammer
LE RESERVOIR MASSAL FAYAT GROUP Amortisation of the water-hammer PRESSURE IN FONCTIONING PRESSURE FALL PHASE PRESSURE GOING UP PHASE

29 LE RESERVOIR MASSAL SOME REALISATIONS San Lorenzo Station (Salvador)
FAYAT GROUP SOME REALISATIONS San Lorenzo Station (Salvador) 2 x 25 m3 in 25 bar

30 Pumping station in Abu Dhabi (UAE)
LE RESERVOIR MASSAL REALISATION FAYAT GROUP Pumping station in Abu Dhabi (UAE)

31 Pumping station in Freyming (France)
LE RESERVOIR MASSAL REALISATION FAYAT GROUP Pumping station in Freyming (France) 1 x 6000 L ; 2 x 500 L ; 1 x 2000 L

32 LE RESERVOIR MASSAL REALISATION 80 m3 tanks in 10 bar (Egypt)
FAYAT GROUP 80 m3 tanks in 10 bar (Egypt)

33 42 m3 tanks in 10 bar (Argentina)
LE RESERVOIR MASSAL REALISATION FAYAT GROUP 42 m3 tanks in 10 bar (Argentina)

34 LE RESERVOIR MASSAL REALISATION Capelle station (France) 2 x 5000 L
FAYAT GROUP Capelle station (France) 2 x 5000 L 1 x 1000 L

35 LE RESERVOIR MASSAL CONCLUSION
FAYAT GROUP LE RESERVOIR MASSAL is especially a partner Free studies from the begining of the project Rapidity of response to a consultant The best studied price Service submitted to a self-control at each station After sale service realized on line