1 External Manufacturing
Standard Operating Procedures

2 Process Objective This process is written down, to provide customer service through a Customer approved OEM. The Delivery of finished good from a third party involves high stakes in the terms of company image and customer continuity The process gives emphasis on quality matching to the customer expectations and the delivery as per customer requirement OEM development, Sample Approval, OEM transactions are the main criteria for the process to meet the objective These all steps are written in detail with the check points and the documentation to ensure smooth flow of information, material and services.

3 Detailed Ext Mfg Process Flow
Sub-Process OEM Approval Process P0 A OEM Development Sample Approval Process New Design Development with existing OEM P0 B P0 B1 Ext Mfg. Process Commercial order/ Partner Management Approved OEM Approved Design Ext Mfg. Business Development P1 P1-A

4 P0 OEM Approval Process A Ext Mfg/Plant Ext Mfg. New Process Ext Mfg
Search prospective OEM- CRU/ Customer or Plant recommendations/ Online at internet Ext Mfg/Plant New Process 1 New Process Share the contract and start contract discussion Ext Mfg. 8 Initiate inquiry with prospective OEM Ext Mfg (Std Communication- C1) 2 9 Audit the OEM and evaluate for commercial sourcing If OEM show interest –Initiate NDA and RFI (Ask for financial statement in RFI) Ext. Mfg 3 Ext. Mfg (Std Comm- C2) Get the partner Registration done in SAP with Partner Registration form and Quality Assessment with approval of Ext Mfg Head Update the OEM in OEM Catalogue Share RFQ for designs to get cost of standard and specific designs Ext. Mfg (Std Comm-C3) 4 10 Ext. Mfg Share vendor assessment and technical assessment formats 5 Ext. Mfg List of Documents: NDA –OEM/F01/001 RFI- OEM/F02/001 RFQ- OEM/F03/001 Self Assessment- OEM/F04/001 Technical Assessment- OEM/F05/001 Financial statement Sample approval report (as per Customer plant) Audit Report Partner Registration Form Contract -Customer / OFC Gurgaon /OEM/ /01 Take samples from OEM and get it approved from plant Ext Mfg Quality / Plant Design 6 Get the final combined rating for OEM and plan for audit 7 Ext. Mfg

5 Sample Approval Process
(This process need to be followed for all new OEMs and new designs for existing OEMs) P0 B Take cable samples from prospective OEM with the desired length (paid or Free)- as per specification Ask for their test certificate New Process 1 Ext Mfg/Design List of Documents: OEM Test Certificate PO for Sample B/L, Invoice , Packing List, Certificate of Origin custom Clearance CAPA sheet for OEM Send samples to Plant Quality Team/ 3rd party testing lab 2 Ext Mfg/ Plant QA Get it tested for all required parameters as per specification sheet Customer approved Testing facility 3 Get the report from testing facility and share the status with OEM Ext. Mfg 4 In case of discrepancies ask for CAPA from OEM and re-evaluate the sample 5 Ext. Mfg/ OEM In cases where customer has asked the samples, provide Customer approved samples to customer Ext. Mfg/ OEM/Sales/ Plant QA 6

6 New Design Approval Process
(Existing OEM) P0 B1 Share the requirement with the OEM and ask for design proposal 1 Ext Mfg/Design New Process List of Documents: OEM Test Certificate PO for Sample B/L, Invoice , Packing List, Certificate of Origin custom Approval (either mail or OEM/F07/001) CAPA sheet for OEM Get the design approval from Customer/ Customer design team Sales/ Design/ Ext Manufacturing 2 Revised Design IF design is approved ask for samples else ask for revised design Plant QA 3 4 Ask for prototype sample and get it approved as per sample approval Ext. Mfg If samples are approved, declare the design as approved design for the OEM and add into OEM catalogue 5 Ext. Mfg/ Design/ Plant QA 6 Provide the PO to OEM as per customer requirement and follow P1 Ext. Mfg

7 Business Development for OEM
P1 A OEM Business KAMs S&Op RFQ Analysis Web-based Enquiry Demand Planning Team RFQ/ PCR analysis (from CRM) Communication with Marketing(KAM‘s) Factory    Website (catalogue based inquiry on website) Demand Planning Team

8 Approved OEM Approved Cable
New Process Place the Order (PO) -Cable Spec/Packing/Delivery must be mentioned Customer Order Communication- Refer P1 A Plant SCM/ Ext. Mfg (2 Days). 1 Sales/ S&Op 6 New Process Ext. Mfg/ Plant Design. (2 Days) 2 Approach OEMs and Validate the Design Available Take the manufacturing Schedule from OEM OEM/Plant SCM / Ext Mfg (1 Day) 7 Ext. Mfg (3 Days). 3 Select the OEM’s (capacity/cost /Geography/ Lead Time) Inspection: Online and PDI Ext Mfg Quality / Plant QA. (5 Days) 8 Take the written acceptance for spec and agreed time line from OEM, and Obtain the Mfg Schedule 4 Ext. Mfg (3 Days). Dispatch confirmation from OEM Plant SCM/ Ext Mfg (15 Days) 9 Response on RFQ at Sales Force And Clear the PCR process Inform Exim/FF/Finance for type of shipment (Ex-works/CIF/DDP) Ext Mfg (3 Days) 10 Plant SCM/ Ext Mfg/ Finance/ Exim (1 day) 5 Finance need to raise invoice. Logistics need to get 2nd BL at destination Port Ext mfg to provide Quality OK certificate to FF Finance/ FTIT/Logistics/ Freight Forwarder/ Ext Mfg 11 A B A

9 (PTL switch B/L are not feasible by sea- to be taken care)
SCMFT-S Mercantile Export Responsibility For export directly to third country Existing Process Existing Process sourcing from third country (other than India) and shipping into another country 1 B For Import to India SCMFT-T Import Clearance (Normal / High Sea Sales) Cargo description, Value, Packing Details, Pickup address, to be given to FF Ext. Mfg/ Plant SCM. (2 Days) 2 Central Logistics/ Plant Logistics ((2 Days) To be done within manf. Lead time Total Time : Sailing Time + 5 Days (clearance time) Plant SCM /FTIDT / Finance/ Logistics (FF) are the key stake holders 3 Finalise Freight Forwarded (PTL switch B/L are not feasible by sea- to be taken care) 1st BL to be issued - Shipper as Supplier, Customer as consignee as mentioned above for Invoice & PL. 4 OEM/Freight Forwarder (1 Day receipt of consignment) Documents B/L Commercial Invoice from OEM Commercial Invoice From Customer Packing List Test Certificate from OEM Test Certificate from Customer to Customer For LC documents will be routed through Bank (Supplier to customer) finance to be involved. First BL to be surrendered & switch BL to be issued by Freight forwarder which will state Shipper as Customer & consignee as Final Buyer(customer). (This can be done at POE or POD). 5 Ext Mfg/ Logistics/ Plant Finance (Invoice)/ Exim/ OEM quality (validate the test Certi) Copy of the Invoice, Packing List & Bill Lading to be submitted to bank mentioning Third country exports against payments received for the said consignment Logistics to follow up 6

10 Detailed Documentation Needed for Logistics
B Import Requirement SN Supplier documents Air Sea Resp Schedule and Handover to CHA 1 Invoice  Scan  Originals  Supplier/ Buyer 3 days before shipment arrival  2 Packing List  3 Test certificate  4 Certificate of Origin (COO) A Switch B/L Requirement Documents to be shared with freight forwarder 2 days prior to shipment dispatch  It Requires full container for switch B/L . In part loads we can not  Part Loads will be less than 5 tonnes

11 Responsibility Sales Ext. Mfg/ Plant SCM. (2 Days) Plant SCM/ Ext Mfg
1 Completion of A or B (Physical delivery completed) Take confirmation from customer for acceptance of Shipment and documents 2 Sales Ext. Mfg/ Plant SCM. (2 Days) 3 Based on acceptance from customer make GRN to close PO of OEM and Inform the same to OEM Verify bill of FF (Plant SCM) and submit to finance Plant SCM/ Ext Mfg (2 Days) Plant SCM Submit the GRN/Invoice to Finance Plant SCM/ Ext Mfg (2 Days) 4 Documents Customer Acceptance Certificate Final OEM invoice Payment approval mail OEM evaluation (based on decided frequency) Governance Meeting agenda and MoM (based on decided frequency) Follow up with finance and ensure timely payment of the OEM). Plant SCM/ Ext Mfg (As per payment term) 5 Plant SCM (As per payment Term) Communicate the payment details to OEM 6 Ext Mfg (as per process) 7 Partner Management by partner Evaluation and Governance

12 Approved OEM New Cable Design
1 Sales/ S&Op 6 Share the sample approval with OEM Customer Order communication Ext Mfg (1 Day) New Process New Process 2 Ext. Mfg. (2 Days) Float Inquiry with Designs to OEM Follow the approved OEM/ Approved design Process 7 Ext. Mfg. 3 Take Confirmation from OEM and Share the design with Design team Ext. Mfg./ Plant Design (3 Days) Customer/ Customer Design. (2 Days) List of Documents: Design Approval by customer or Customer design team Design Acceptance from OEM Sample Approval report from Customer Approve the Design 4 Take the sample from OEM 5 Ext Mfg/ Logistics (As agreed bet parties) 6 Test the sample at Customer factory/ Ext Mfg/Plant Quality (6 Days)

13 OEM Relationship Management
Partner Evaluation Ext Manufacturing to evaluate OEM on following Key Indices every month (for active transactional OEMs) Timely Delivery (meeting the commitments) Documentation Quality of Delivery Response Time to Inquiries and Issues Inquiry Floated to Inquiry converted ratio Customer Feedback Feedback from Customer Price competitiveness Partner Governance Ext Manufacturing to establish a quarterly governance calendar based on performance for Active- Transactional OEM Feed back from customer to be taken and discussed with OEM as part of governance SCMPM-T Partner governance

14 Thank You