Presentation is loading. Please wait.

Presentation is loading. Please wait.

SAB Sponsor Progress Report

Similar presentations


Presentation on theme: "SAB Sponsor Progress Report"— Presentation transcript:

1 SAB Sponsor Progress Report
Paul R. Croll Software and Systems Engineering Standards Committee (S2ESC) February 1, 2017

2 Software and Systems Engineering Standards Committee Portfolio
Over 50 standards in the areas of software and systems engineering Liaisons with: ASQ CMMI Institute IEEE Reliability Society INCOSE NASA ISO/IEC SC7/SC40 SEI Number of standards under development: 14 982.1, 1009, 1012, , , 1760, 12207, , 15939, , , , , 26513 Number of under-development standards to be published this year: 5 1012 approved, pending publication 15939 26513 Number of under-development standards needing an extension this year: 3. ACTION: Contact WG Chairs to file for PAR extension now. 1723.1, , Number of under-development standards likely to be dropped: 1 1009 expires 12/31/2016

3 26 Active Projects – 1 of 2 P982.1, Standard for Measures of the Software Aspects of Dependability P /Cor 1, Standard for System, Software and Hardware Verification and Validation - Corrigendum 1 P1723.1, Open Group Standard SOA Reference Architecture P1723.2, The Reference Architecture Foundation for Service Oriented Architecture Version 1.0 P1760, Information Technology Service Measures and Service Level Agreements P2675 , DevOps, Standard for Building Reliable and Secure Systems Including Application Build, Package and Deployment P7000 , Model Process for Addressing Ethical Concerns During System Design P7002, Data Privacy Process P12207, Systems and software engineering -- Software life cycle processes P , Adoption of Systems and software engineering --Systems and software assurance -- Part 3: Systems integrity levels P15289, ISO/IEC/IEEE Systems and Software Engineering -- Content of Life-Cycle Information Items (documentation) P15939, Systems and Software Engineering - Measurement Process P16085, ISO/IEC 16085:2006, Standard for Software Engineering - Software Life Cycle Processes - Risk Management

4 26 Active Projects – 2 of 2 P16326, ISO/IEC/IEEE International Standard Systems and Software Engineering--Life Cycle Processes--Project Management P , Information Technology -- Service Management -- Part 1: Service Management System Requirements P , Systems and Software Engineering - Life Cycle Management - Part 1: Guidelines for Life Cycle Management (P ) P , Systems and Software Engineering-- Life Cycle Management-- Part 2: Guidelines for the Application of ISO/IEC/IEEE (System Life Cycle Processes) P , Systems and Software Engineering--Life Cycle Management--Part 5: Software Development Planning P24765, Systems and Software Engineering - Vocabulary P26512, /ISO/IEC Standard for Systems and Software Engineering -- Requirements for Acquirers and Suppliers of Information for Users P26513, Systems and Software Engineering -- Requirements for Testers and Reviewers of User Documentation P26515, Systems and Software Engineering -- Developing Information for Users in an Agile Environment P29148, ISO/IEC/IEEE International Standard - Systems and Software Engineering -- Life Cycle Processes --Requirements Engineering P42010, /ISO/IEC Standard for Systems and Software Engineering -- Architecture Description P42020, Standard for Systems and Software Engineering -- Architecture Processes P , Information technology: Information for Use of Products -- Part 1: General Requirements and Processes

5 New S2ESC PARs P2430: Standard for software nonfunctional sizing measurement P2675: DevOps - Standard for Building Reliable and Secure Systems Including Application Build, Package and Deployment P7003: Algorithmic Bias Considerations1 P2030.4: Guide for Control and Automation Installations Applied to the Electric Power Infrastructure P21839: Systems Engineering – Systems of Systems Considerations in Engineering of Systems P26511: Systems and software engineering –Requirements for managers of information for users of systems, software, and services 1P7000: Model Process for Addressing Ethical Concerns During System Design (umbrella Standard) New PARS not yet opened as of 5/12/16

6 Challenges Time and travel support for volunteers remains a challenge
We are using virtual meetings to the almost exclusively CPS Presentation to IEEE President 12 May 09

7 Questions? Paul R. Croll Chair, IEEE Software and Systems Engineering Standards Committee PR Croll LLC CPS Presentation to IEEE President 12 May 09


Download ppt "SAB Sponsor Progress Report"

Similar presentations


Ads by Google