Presentation is loading. Please wait.

Presentation is loading. Please wait.

We Apologize for the Road Construction!

Similar presentations


Presentation on theme: "We Apologize for the Road Construction!"— Presentation transcript:

1 We Apologize for the Road Construction!

2 It Really will Make Things Better When it’s Finished!

3 Until Then – Just use this Easy Way to Reach Us!

4 Turn West on Carmel Drive
Stop Light Intersection -Hamilton Crossing Shopping Center is on South-east corner

5 Go through Roundabout Carmel Drive turns into Illinois Street Just stay on Illinois Street

6 At 136th Street Roundabout Turn Right onto 136th Street
Beeson Cosmetic Surgery is 100 Yards on Your Right!

7 Some Detours can be Confusing!

8 But This Detour is Easy!

9 And if you have any problems – just call us at 317-846-0846 and we’ll guide you through!

10 THANK YOU !


Download ppt "We Apologize for the Road Construction!"

Similar presentations


Ads by Google