CJK NGN test-bed study Phase Ⅲ&Ⅳ

Similar presentations


Presentation on theme: "CJK NGN test-bed study Phase Ⅲ&Ⅳ"— Presentation transcript:

1 CJK NGN test-bed study Phase Ⅲ&Ⅳ
Test-bed Ad-hoc Group Hideaki YAMADA KDDI (KDDI R&D Labs.)

2 Study phases on the CJK test-bed
Phase I: rd/4th Quarter (Completed) Network Connectivity Scenario 2 and 4 only (2 CS and 2 domains) Status Report during 8th CJK NGN Meeting (January 2007) Phase II: st/2nd Quarter (Completed) Scenario 1 and 3, (simpler version of 2 and 4, single domain) Status Report at the 12th CJK NGN Meeting (March 2008) Phase III: st/2nd Quarter Performance Evaluation of RTP/RTCP-based MoIP (Multimedia(Voice/Audio/Video) over IP) service Network connective for Performance evaluation and Performance Monitoring Scenarios 6-1 and 6-2 Status report at the 13th CJK NGN Meeting in or 10 Phase IV: rd ~ nd Quarter Performance Evaluation of RTP/RTCP-based MoIP and IPTV services Performance Monitoring Scenarios 6-3 and 6-4 Initial RACF Interoperability testing : Scenario 7 Testing of RACF and RTP/RTCP-based MPM Interactions IPTV Interoperability testing Status report at the 14th and 15th CJK NGN Meetings CJK NGN Test-bed

3 Test Scenario 6,7 in Phase III & IV
Performance Evaluation with RTP/RTCP-based Measurement extensions and initial RACF interoperability testing. Scenario 6-1: Performance evaluation of Network Segments MoIP (Multimedia (Voice/Audio/Video) over IP) service based on CS and/or IMS Scenario 6-2: Performance evaluation of MoIP service among CPEs Local testing of MPM (Provided by KDDI R&D Labs.) CPE-to-CPE performance evaluation Scenario 6-3: Performance evaluation of MoIP service with two MPMs CPE – MPM1 – MPM2 – CPE performance evaluation Scenario 6-4: Performance evaluation of MoIP service with three MPMs CPE – MPM1 – MPM2 – MPM3 – CPE performance evaluation Scenario 7: Testing of RACF and RTP/RTCP-based MPM Interactions Note: Development of the ATCA (SBC of OKI Electric Industry) based MPM is planned.

4 Network configuration

5 FMC all-IP networks Voice Video Audio Concurrent (Multimodal) services
Supporting of multicast/unicast streams and mobility functions Voice Video Audio Concurrent (Multimodal) services FMBC (Fixed Mobile and Broadcast Convergence) services

6 Evaluation scenarios (updated)
Scenario No. IP Network Service Platform Services CPE terminals and other equipment Evaluations Countries Report Note Metrics Connections 6-1 C-K: R&D Network C-J: Commercia l Network K-J: Commercia l Network SIP RTP      Streams (MoIP: Multimedia over IP) Voice/ Audio/ Video) >>IPTV CPE (VoIP/Video): J (Soft/Hard), K, C Call Server: K, C, J(Emulator) MPM: J (Soft/Hard), K Y.1543 Local test C,J,K Two MPMs   C-J, K-J, C-K Three MPMs C-J-K 13th CJK meeting In progress 6-2 RTCP (CPE- CPE) CPE-CPE 6-3 RTCP (CPE- MPM1- MPM2- CPE) CPE-MPM 6-4 RTCP (CPE- MPM1- MPM2- MPM3- CPE) 7 SIP/ IMS-SIP RACF: K, J(1st: ACF,        2nd: RCF) MPM-RACF 14th or 15th CJK meeting

7 Schedule Target dates should be discussed !

8 Role-sharing arrangement
Date Status Note IP Network Commercial IP-NW (CJ) J OK Commercial IP-NW (KJ) 3/25 on schedule R&D IP-NW (CJ) C, J  TBD R&D IP-NW (KJ) K, J  CK-NW K Service Platform Call server (C) C To be prepared Simple SIP Call server (K) K  Call server emulation (J) J  Simple SIP >> IMS CPE  Voice/Video Terminal (C) C  PC, (Dedicated Terminal provided by KDDI R&D Labs.) Voice/Video Terminal (K) Voice/Video Terminal (J) OK  MPM PC based MPM (C) 1st : Provided by KDDI R&D Labs. PC based MPM (K) PC based MPM (J) Evaluations Scenario 6-1 C, J, K CJ April 2008 KJ April 2008  CK  Scenario 6-2  CK       Scenario 6-3 C, J, K   Scenario 6-4 Scenario 7 RACF (1st : Admission Control) Reports 13, 14, 15th -WG

9 Target dates of Scenario 6-1,6-2,6-3,6-4 and 7 Scenario 6-1 and 6-2
Discussions IP connectivity Routing equipment, IP addressing, Operation, etc. Services Testing priority of Voice, Video, Audio (RTP streams) Target dates of Scenario 6-1,6-2,6-3,6-4 and 7 C-J , K-J, C-K testing Scenario 6-1 and 6-2 Testing procedures, Drafting of the checking sheet, instauration of MPM (importation) Specifications of Call servers (C and K) Reporting Rotating the role among CJK

10 Thank you for your attention.
This work is partly supported by the National institute of Information and Communications Technology (NICT).