Presentation is loading. Please wait.

Presentation is loading. Please wait.

Nick Hatton Associate Staff Engineer

Similar presentations


Presentation on theme: "Nick Hatton Associate Staff Engineer"— Presentation transcript:

1 Nick Hatton Associate Staff Engineer
Base Case Basics Nick Hatton Associate Staff Engineer Western Electricity Coordinating Council

2 Western Electricity Coordinating Council
Introductions From the WECC Staff: Enoch Davies Doug Tucker Nick Hatton Matt Torgesen Elena Melloni Western Electricity Coordinating Council

3 Western Electricity Coordinating Council
Discussion Outline WECC Base Case Building Procedure Reporting Data Anomalies Western Electricity Coordinating Council

4 Base Case compilation Schedule
DATE DATA REQUEST MAILED DATE DATA DUE TO SUB COORD DATE DATA DUE TO AREA COORD DATE DATA DUE TO STAFF STAFF SEND CASE FOR REVIEW DATE COMMENTS DUE TO SUB COORD DATE COMMENTS DUE TO AREA COORD DATE AREA COORDINATOR COMMENTS DUE TO STAFF STAFF FINALIZE DATE 2017 LSP2-S 07/01/16 07/15/16 07/22/16 08/26/16 09/09/16 09/16/16 09/23/16 09/30/16 10/14/16 2018 LA1-S 08/05/16 08/19/16 10/21/16 10/28/16 11/04/16 11/18/16 HW1 11/23/2016 11/25/16 12/02/16 12/16/16 2027 HS1 12/09/16 12/23/16 12/28/2016 12/30/16 01/06/17 01/20/17 CASE DATE DATA REQUEST MAILED DATE DATA DUE TO DATA SUBMITTER DATE DATA DUE TO WECC STAFF WECC STAFF SEND CASE FOR REVIEW DATE COMMENTS DUE TO DATA SUBMITTER DATE DATA SUBMITTER COMMENTS DUE TO WECC STAFF WECC STAFF FINALIZE DATE HW3-OP 11/18/16 12/16/16 01/13/17 02/10/17 02/24/17 03/03/17 03/17/17 LW2-OP 2018 HSP1-OP 03/10/17 03/24/17 04/07/17 04/14/17 04/28/17 HW2 04/21/17 05/19/17 06/02/17 06/09/17 06/23/17 2023 HS1 2018 HS2-OP 06/16/17 07/14/17 07/28/17 08/04/17 09/01/17 2018 LS1-OP 20xx-TEPPC N/A 09/08/17 09/22/17 09/29/17 10/13/17 2021 LSP1-S 07/21/17 08/18/17 09/15/17 09/29/2017 10/13/2017 10/20/2017 11/03/2017 HW1 10/27/17 11/10/17 11/17/17 12/01/17 2028 HS1 HW1-S 10/06/17 11/03/17 12/15/17 12/29/17 01/05/18 01/19/18 Western Electricity Coordinating Council

5 Base Case Building Power flow
From each Data Submitter we should receive the following: Area Specific power flow data L&R spreadsheet Any dynamic model changes/updates Any tie line changes (must be coordinated!!!) List of significant changes Any additional info that will help with base case compilation Western Electricity Coordinating Council

6 Western Electricity Coordinating Council
Extracting Area Data Western Electricity Coordinating Council

7 The Master Tie Line File
Contains data for the following: Branches Transformers Line connected shunts DC lines (Bus, Line, DCC) Transformer impedance tables Interface data (Paths) Branch interface data Zones Owners Area Interchange Western Electricity Coordinating Council

8 Western Electricity Coordinating Council
Tying It All Together Western Electricity Coordinating Council

9 Area Interchange Schedules
BC Hydro Interchange with Northwest 2300 MW Northwest Interchange with BC Hydro -2300 MW Western Electricity Coordinating Council

10 Power Flow Solution and Data Checking
Tie line check Island check Edit table checks Mustfix.p Checks.p svdsnap.p Pathmoni.p Dchk Overload check Branches (Chkrating.p) Paths (Pathmoni.p) DCINTMT.p PSS®E Users Data InsertLID.p InsertGENID.p Baseloader.p InsertTurbine.p FillRatingsPSSe.p Contingencies (Operations Cases) Replog PowerWorld PSS®E Conversion WECCLF Case IDV Western Electricity Coordinating Council

11 Questions About Power Flow Compilation?
Western Electricity Coordinating Council

12 Base Case Building - Dynamics
The Master Dynamics File (MDF) Models Updates in PSLF format Temporary vs. permanent changes Condenser and pump check Unused models Composition load models Western Electricity Coordinating Council

13 Initializing Dynamics Data
Reading in the MDF Missing data Duplicate models Initialization Governor errors/warnings Exciter errors Other messages Western Electricity Coordinating Council

14 Western Electricity Coordinating Council
Running and Plotting A no-disturbance run The alldyns.p disturbance routine Ringdown Double Palo Verde Outage (when PDCI flow is N-S) Loss of PDCI (when PDCI flow is S-N) Post-transient solution Disturbances Metcalf-Moss landing, Tesla-Metcalf Comanche-Daniels Park Colorado River – Red Bluff Hells Canyon – Brownlee Double Palo Verde Outage DYTOOLS? Western Electricity Coordinating Council

15 Western Electricity Coordinating Council
Plotting Plotting the channel file Searching for the largest deviation (spread) Plotting Parameter Western Electricity Coordinating Council

16 Western Electricity Coordinating Council
Plotting Western Electricity Coordinating Council

17 Base Case Building - Comments
Types Submitted in EPCL, EPC, .m, or by list Working to include IDV MUST be made to review case Changes to tie lines must be coordinated Extensive data changes Western Electricity Coordinating Council

18 Questions about Dynamics and Comment Submission?
Western Electricity Coordinating Council

19 Reporting Data Anomalies
Master Tie Line File Data Series Compensation New Phase Shifters PSS Exemptions Dynamics Data Western Electricity Coordinating Council

20 Western Electricity Coordinating Council
Questions Nick Hatton Western Electricity Coordinating Council


Download ppt "Nick Hatton Associate Staff Engineer"

Similar presentations


Ads by Google