2 Details of SPMU NPMU for Chhattisgarh is constituted vide Govt of Chhattisgarh No 4614 /F-1-105/31/S-2/HP III/01/2015 dated 03/11/2016. 1 Project Coordinator Shri Ganesh Shankar Mishra Secretary, Government of Chhattisgarh Water Resources Department,Mahanadi Bhawan,Naya Raipur Chhattisgarh. 2 Nodal Officer Shri H.R. Kutare Engineer – in – Chief Water Resources Department Raipur Chhattisgarh. 3 Chief Engineer Shir Jayant Pawar Chief Engineer , Mahanadi Godawari Basin, Water Resources Department, Raipur Chhattisgarh 4 Superntending Engineer Shri S.K. Awadhiya Superntending Engineer, Water Resources & Ground Water Survey Circle Raipur Chhattisgarh 5 Sr. Water Management Expert Shri R.K. Sharma Executive Engineer, O/o Chief Engineer, Mahanadi Project Raipur Chhattisgarh 6 Procurement Expert Shri D.K. Sonkusale Executive Engineer, O/o Superntending Engineer, Water Resources & Ground Water Survey Circle Raipur Chhattisgarh 7 Geo-hydrologist Shri S.M. Sendiman Senior Geohydrologist, O/o Superntending Engineer, Water Resources & Ground Water Survey Circle Raipur Chhattisgarh 8 MIS Expert Shri J.N. Vishwakarma Assistant Engineer, O/o Deputy Director, Hydrometeorology Divison No. 04 Raipur Chhattisgarh 9 Hydrologist Shri V.K. Sonwani Assistant Engineer, O/o Superntending Engineer, Water Resources & Ground Water Survey Circle Raipur Chhattisgarh

3 Fund Received & Expenditure
Year Amount (in lakhs) 20.56 105.00 Total 125.56 Expenditure 0.00

4 Major Procurement item in PIP
Item Code Item Amount (in lakhs) A RTDAS for Chhattisgarh - Goods A RTDAS for Chhattisgarh – Civil Works Total

5 Major Procurement item in AWP 2016-17
- Nil -

6 Major Procurement item in AWP 2017-18 and their status
Item Code Item Amount (in lakhs) Status A RTDAS for Chhattisgarh - Goods Bid Document submitted Observation Network prepared and sent to NPMU, New Delhi for approval. A RTDAS for Chhattisgarh – Civil Works Total

7 Procurement of IT Equipment
Physical Progress Completed Procurement of IT Equipment Item No Desktop Computer 8 Nos Laptop 3 Nos Printer A4 10 nos Scanner 6 Nos Digital Copier Multifunctional 1 Nos

8 Physical Progress Proposed RTDAS for Chhattisgarh Goods 1 Job
Civil Work Procurement of Equipment Air conditioners for State Data Center 15 Nos UPS online 15 KVA 2 Nos LCD Projector 1 No Inspection Vehicle Software Arc GIS

9 Status of Bid Document NATIONAL COMPETITIVE BIDDING FOR-PROCUREMENT OF GOODS AND RELATED SERVICES FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF REAL TIME DATA ACQUISITION SYSTEM IN CHHATTISGARH Bid Document submitted. Observation Network prepared and sent to NPMU, New Delhi for approval on 02 /06 /2017, appoval awaited. Bid document may kindly be approved except cost component, the same will be kept as per approval.

10 Status of Studies / PDS Following 2 Nos. revised PDS resubmitted to Nodal Agency NIH Rookee for approval. Assessment of Crop Water Requirement for Selected Command in Mahanadi Basin of Chhattisgarh for Optimal Utilization of Irrigation Water . Hydrological modeling for un-gauged catchments in Mahanadi Basin .

11 Status of Data entry in E-SWIS
Rainfall and Gauge-discharge data of existing 4 Nos station from SWDES (period ) imported in to E-SWIS successfully. Work is in progress & Data of remaining stations will be imported in coming months.

12 Status of Hydromet Station ( SW)
Reconciliation with state, CGWB, CWC, IMD etc. Observation Network prepared and sent to NPMU, New Delhi for their consideration /approval on 02/06 /2017, the same is awaited.

13 Status of WRIS Required support from MoWR, RD & GR New Delhi to establish WRIS in State.

14 Status Public Finance Management System
(PFMS) Support and training required for State staff for PFMS.

15 Any other issues E-procurement system for state is still not finalised. Insurance of RTDAS field equipments is essential for safety. So this may be taken in to consideration during finalisation of Bid document.

16 Way forward

17 THANKS