2 Introduction - Current System
DZ01 is originally divided into 6 zones. Current Water Source: Ain Ghazal Reservoir through two pipes Ø400mm & Ø300mm DI to Marka ground reservoir. A New primary Ø600mm DI pipeline from Abu Alanda Reservoir will feed Marka ground reservoir (under construction) and Districts A & C will be supplied directly through Ø400mm DI branched from the same pipeline. Number of customers: 18,000 customers. Number of persons as per CDM study: 6.6 persons/customer. Network received from GIS department and updated through meetings with Miyahuna operation and maintenance concerned personnel as well as extensive site visits to verify the elevations, boundaries, critical areas …etc. Current System

3 Population Current System District No. of Customers Population 01A
8,203 54,140 01B 5,256 34,690 01C 2,438 16,091 01D 264 1,742 01E 1,652 10,903 01G 120 792 Total 18,000 118,500 Current System

4 Min. and Max. Elevations Current System District H.P. L.P.(All)
Difference L.P (Developed) 01A 795 725 70 750 45 01B 776 690 86 696 80 01C 777 743 34 01D 728 674 54 01E 755 665 90 01G 740 685 55 692 48 Current System

5 Districts and Main Feeders Layout- Existing Network
Main Feeders- Existing Current System

6 Current System- Schematic
Schematic- Existing Current System

7 Hydraulic Analysis Demand: C (Roughness Coefficient):
District Population Avg. Demand (m³/d) Peak Demand (m³/d) 01A 54,140 8,662 17,324 01B 34,690 5,550 11,100 01C 16,091 2,575 5,150 01D 1,742 280 560 01E 10,903 1,745 3,490 01G 792 127 254 Demand: Base consumption 120 l/c/d 25% NRW C (Roughness Coefficient): Ex. Steel & Galv Ex. DI Ex. PE New pipes Current System

8 Hydraulic Model – Existing System Ground Reservoir Districts
Current System

9 Hydraulic Model – Existing System Tower Districts
Current System

10 Hydraulic Model Results- Existing
Pressure Pressure Range (Bar) Percentage (%) P < 1 ≈ 0 1 ≤ P ≤ 5 90 P > 5 10 Total 100% Current System

11 Proposed System The proposed solutions include:
Modify Districts’ Boundaries Spilt Districts Replace main Feeder Add PRVs and District Meters Proposed System

12 Districts and Main Feeders Layout- Proposed System
Main Feeders- Proposed Proposed System

13 Proposed System- Schematic
Schematic- Proposed Proposed System

14 Min. and Max. Elevations- Proposed
District H.P. L.P.(All) Difference L.P (Developed) 01A 795 725 70 750 45 01B1 776 690 86 696 80 01B2 774 704 714 60 01B3 760 56 46 01B4 764 745 19 01C 777 743 34 01D 728 674 54 01E 755 665 90 01G 740 685 55 692 48 Proposed System

15 District B Proposed System

16 PRVs’ Proposed Locations
Proposed System

17 Hydraulic Model – Proposed System Ground Reservoir Districts- Peak

18 Hydraulic Model – Proposed System Tower Districts -Peak

19 Hydraulic Model Results- Proposed- Peak Demand
Pressure Pressure Range (Bar) Percentage (%) P < 1 ≈ 0 1 ≤ P ≤ 5 95 P > 5 5 Total 100% Proposed System

20 Model Results Comparison
Existing System Proposed System - Peak Pressure Range (Bar) Percentage (%) P < 1 ≈ 0 1 ≤ P ≤ 5 90 P > 5 10 Total 100% Pressure Range (Bar) Percentage (%) P < 1 ≈ 0 1 ≤ P ≤ 5 95 P > 5 5 Total 100% Proposed & Current Systems

21 Hydraulic Model – Proposed System Reservoir Districts- Average Demand

22 Hydraulic Model – Proposed System Tower Districts- Average Demand

23 Hydraulic Model Results Average Demand Scenario
Pressure Pressure Range (Bar) Percentage (%) P < 1 ≈ 0 1 ≤ P ≤ 5 95 P > 5 5 Total 100% Proposed System

24 Hydraulic Model – Proposed System Reservoir Districts- Night Flow

25 Hydraulic Model – Proposed System Tower Districts- Night Flow

26 Hydraulic Model Results Night Flow Scenario
Pressure Pressure Range (Bar) Percentage (%) P < 1 ≈ 0 1 ≤ P ≤ 5 96 P > 5 4 Total 100% Proposed System

27 PRV Settings- Peak, Average & Night Flow Scenarios
District PRV DM Peak Demand Average Demand Night Flow Pressure From to (Bars) Flow (m3/d) 01A 3.9 ~ 2.5 22,474 3.9 ~ 1.5 11,237 3.9 ~ 1.3 2,247 01B1 Inactive 2.8 ~ 1.8 2,687 2.9 ~ 1.6 537 01B2 1.6 ~ 1.3 1,396 1.7 ~ 1.3 279 01B3 3.3 ~ 1.7 5,568 3.8 ~ 1.7 2,784 4.0 ~ 1.0 557 01B4 - N/A 01C 4.0 ~ 2.0 5,149 3.5 ~ 1.7 2,575 515 01D 4.6 ~ 2.0 533 4.9 ~ 1.7 266 4.3 ~ 1.7 53 01E 6.4 ~ 4.9 3,489 6.8 ~ 4.0 1,745 6.2 ~ 3.7 349 01G 5.8 ~ 2.0 253 5.5 ~ 0.5 127 25 Proposed System

28 Pipe, PRVs & DMs Quantities
Line Diam. (mm) & Material Total Length (m) 400 DI ≈ 500 District Name PRV Quantity DM Quantity New or Replace Pipe Diameter (mm) 01A 1 New New 400DI 01B1 Ex. 250DI 01B2 01B3 Ex. 300DI 01B4 Ex. 150DI 01C Replace in Ex. Chamber 01D Ex. 100DI 01E Ex. 200DI 01G Total 8 9 Proposed System