CITY COUNCIL STUDY SESSION:

Similar presentations


Presentation on theme: "CITY COUNCIL STUDY SESSION:"— Presentation transcript:

1 CITY COUNCIL STUDY SESSION:
SANTA ANA HEIGHTS COMMUNITY CENTER CITY COUNCIL STUDY SESSION: AQUATICS April 11, 2006

2 OUTLINE OF PRESENTATION
Common Competition Pool Sizes Competition Capabilities by Pool Size Required Infrastructure by Pool Size Capital and Operating Costs by Pool Size Balancing Competition and Recreation Cost Recovery

3 COMMON COMPETITION POOL SIZES
25 Yard x 25 Meter 25 Yard x 30 Meter 25 Yard x 35 Meter 25 Yard x 50 Meter 25 Yard x 50 Meter “Stretch”

4 25 Yard x 25 Meter Pool Walter Graham Aquatic Center

5 25 Yard x 30 Meter Pool Salyer High School

6 25 Yard x 35 Meter Pool Amador Valley High School

7 25 Yard x 50 Meter Pool William Woollett, Jr. Aquatic Center

8 25 Yard x 50 Meter “Stretch” Pool
U.C. Davis Schaal Aquatic Center

9 COMPETITION CAPABILITIES BY POOL SIZE

10 REQUIRED INFRASTRUCTURE- 25Y x 25M
Pool Deck Footprint: 115’ x 127’ Bathhouse: 3,000 – 3,500 SF Spectator Seating: 300 Parking: 88 Cars Site Footprint: 1.8 acres

11 REQUIRED INFRASTRUCTURE- 25Y x 30M
Pool Deck Footprint: 115’ x 143’ Bathhouse: 4,000 – 4,500 SF Spectator Seating: 350 Parking: Cars Site Footprint: 2.1 acres

12 REQUIRED INFRASTRUCTURE- 25Y x 35M
Pool Deck Footprint: 115’ x 159’ Bathhouse: 5,000 – 5,500 SF Spectator Seating: 400 Parking: Cars Site Footprint: 2.4 acres

13 REQUIRED INFRASTRUCTURE- 25Y x 50M
Pool Deck Footprint: 115’ x 209’ Bathhouse: 7,000 – 7,500 SF Spectator Seating: 500 Parking: Cars Site Footprint: 3.2 acres

14 INITIAL CAPITAL COSTS*
25 Yard x 25 Meter: $ 861,000 25 Yard x 30 Meter: $1,029,000 25 Yard x 35 Meter: $1,197,000 25 Yard x 50 Meter: $1,722,000 * Does not include site work, pool decks, landscaping or buildings.

15 ANNUAL OPERATING COSTS*
25 Yard x 25 Meter: $127,803 25 Yard x 30 Meter: $152,741 25 Yard x 35 Meter: $177,678 25 Yard x 50 Meter: $255,607 * Includes water, electricity, natural gas and chemicals; exclusive of labor.

16 SITE IMPACT- 25 YARD x 25 METER POOL

17 SITE IMPACT- 25 YARD x 30 METER POOL

18 SITE IMPACT- 25 YARD x 35 METER POOL

19 SITE IMPACT- 25 YARD x 50 METER POOL

20 BALANCING COMPETITION AND RECREATION
Water Depth: Deep water for competition vs. shallow water for recreation Differential Water Temperatures: F for competition vs F for recreation Infrastructure required for large competitive meets (i.e, spectator seating for 2,500; parking for 800 cars Difference in cost recovery between competition and recreation- oriented facilities

21 Competition Only- Indoor
Municipal Pool at Dula Center

22 Competition Only- Outdoor
William Woollett Jr. Aquatic Center

23 Competition + Recreation- Indoor
S.I.S.D. Aquatic Center

24 Competition + Recreation- Outdoor
Folsom Aquatic Center

25 Recreation Only- Indoor
Marcos B. Armijo Community Center

26 Recreation Only- Outdoor
Denton Aquatic Center

27 SAMPLE SURVEY FORM

28 COST RECOVERY: DIFFERENT PROJECT TYPES

29 QUESTIONS?

30

31

32

33 P&L: COMPETITION ONLY- INDOOR

34 P&L: COMPETITION ONLY- OUTDOOR

35 P&L: COMPETITION / RECREATION- INDOOR

36 P&L: COMPETITION / RECREATION- OUTDOOR

37 P&L: RECREATION ONLY- INDOOR

38 P&L: RECREATION ONLY- OUTDOOR