PS3: Protection & Control of Series Compensated Networks

Similar presentations


Presentation on theme: "PS3: Protection & Control of Series Compensated Networks"— Presentation transcript:

1 PS3: Protection & Control of Series Compensated Networks
Q8 b) What are the requirements of utilities in terms of certification tests for relays and/or protection systems before applying these to series compensated lines?

2 Electricity Supply Network

3 SP AusNet Network 1998 330KV Double Circuit 225km

4 Project Objectives Compensation: 50 %
DDTS No 1 line Compensation: 50 % Transfer Capability restored to 1500 MW, 36% improvement Total project cost $A13.5 M Completion period 14 months No 2 line SMTS

5 Capacitor Arrangement
DDTS SMTS Bypass Circuit Breaker Spark Gap MOV Discharge Reactor

6 Distance Relay Problems
Distorted Distance Measurement Incorrect Directionality (Voltage & Current inversions) Transient over- and under-reach ( Sub- sychronous Transient Oscillations) Nonlinear & solid by-passing of capacitors initiate transient changes of : Voltage magnitude and polarity Impedance measured

7 Incorrect Reach A B E D C Line # 2 Line # 1 Line # 3

8 Fault Simulations

9

10 Internal Fault jX Forward (operating) reach dynamic static First cycle Second cycle Third cycle Z R Reverse (blocking) SMTS, No 1 (Faulty) Line Relay, Fault on No 1 line, MOV, no Gap

11 External Fault jX Forward (operating) reach Z dynamic static First cycle Second cycle Third cycle R Reverse (blocking) SMTS, No 2 (Healthy) Line Relay, Fault on No 1 line, MOV, no gap

12 Relay Selection 2 x Distance + existing Power Line Carrier
reliable Under/over reach transmission time 30ms 1 x Current Diff + new μWave Radio many faults faster than distance schemes signal fading

13 Operating Times 1 2 3 5 10 20 30 40 50 60 SMTS Loc 1 Loc 2 Loc 3 Loc 5
10 20 30 40 50 60 SMTS Loc 1 Loc 2 Loc 3 Loc 5 DDTS X SEL/S X SEL/D X LFCB/S X LFCB/D Y ALPS/S Y ALPS/D 1 2 3 5

14 Summary Transient fault studies essential for SC Lines
Difficulty to gather data. Automatic Test Equipment extremely useful design tool Derived from paper: “Fault simulation studies for protection of series compensated lines” Adam Klebanowski, GPU PowerNet, Victoria, Australia Asia Pacific Regional ProTest (DOBLE) User Group Meeting, Melbourne, Australia, 1999