1 Public Private Partnership (P3)
Innovative Approach Public Private Partnership (P3)

2 The Partnership ADOT and Connect 202 Partners

3 What is a P3? ADOT Responsibility C202P Responsibility
Retains ownership Sets performance standards Oversight C202P Responsibility Design – build – maintain (30 years) Incentive to build quality Financial penalties If performance and quality standards not met

4 What are the Benefits of a P3?
Acceleration Integrated design and construction Finished 3 years sooner Efficiency One group for entire corridor Previous plan for 9 projects $122 Million Savings Returned to regional transportation fund

5 Loop 202 South Mountain Freeway
Largest Project in Arizona History $1.77 Billion Programmed Publically financed 40% federal funding 60% Proposition 400 Completion: Late 2019

6 A Whole Lot of Materials
Walls 2 million square feet 34.5 football fields (11 miles) Concrete 360,000 cubic yards 3.5x used for stadium Dirt/Earthwork 10 million cubic yards Fill stadium 13 times

7 The Design Final design underway

8 Roadway Design Constructing Ultimate Build-Out 8 Lanes Median Barrier
Pecos Road Constructing Ultimate Build-Out 8 Lanes 3 general purpose and 1 HOV in each direction Median Barrier No plans to add future capacity

9 Interchanges

10 Aesthetics Innovative Collaboration 5 unique Character Areas
Frank Lloyd Wright Foundation Cosanti Foundation 5 unique Character Areas Different structure treatments Rock sculpting and coloring

11 2017 Flyover Visualization

12 The Construction

13 Segment Phasing Schedule
4 Construction Segments Start Dates Announced

14 Stay in the Loop

15

16 INFORMATION Hotline: 1-855-SMF-L202 Para Española: 623-239-4558