1 Part 75-2A Piles, steel-core piles and micropiles Static test loadings II/2013, modified 11/ (Part 75-2, PP 2007, animation+p/r : compr.) Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited. ready

2 Steel-core piles for underpinning (replacement pile, grouted in-situ, permanent casing required)
ready

3 Rapport 97 End-bearing or end-bearing and by friction along the shaft within rock socket (alt. in soil along drill casing) ready

4 Casing is left in the ground
ready Steel-core piles press press

5 ready Rapport 97

6 ready Rapport 97

7 Ring bit and integrated casing shoe for the Down-The Hole-Hammer (DTH)
Percussed none rotating casing with button bits with inserted the Down-The Hole-Hammer (DTH) ready Ring bit and integrated casing shoe for the Down-The Hole-Hammer (DTH) Percussed none rotating casing with button bits Drilling with Robit method in soil press press

8 Robit DTH drilling for steel-core piles at Torsgränd in Stockholm
press press ready

9 Steel-core piles at Torsgränd in Stockholm
press ready

10 Overloading of piles due to uneven load distribution under settlement process
press ready

11 P1 = P2 = P3 P1÷3 Lfree_1,2,3 s = (f) actual load s = (f) actual load
press press ready

12 P1,3 >P2 P2 P1,3 Lfree_1,3 Lfree_2 s = (f) actual load
press press ready

13 Water- and dry air flush in the same ground conditions
press ready

14 Steel-core piles. Stage 1: drilling in soil
press press ready press

15 Stage 2: drilling in rock
press ready

16 Robit DTH drilling for steel-core piles through sand layer
press ready Robit DTH drilling for steel-core piles through clayely sand layer close to the rock surface Robit DTH drilling for steel-core piles through sand layer Robit DTH drilling for steel-core piles through cement grouted rock fill Robit DTH drilling for steel-core piles in the rock

17 A record of the driller’s observations on progress of drilling, rate of penetration, speed and uniformity of rotation of bit, action of the drill rig such as jerky, smooth, rough, steady etc. Length of each core run and the length, percentage or both of core recovered along with location and cause of core loss (core drilling only). Any changes in the character of the drilling water or mud, and in case the drilling water disappears, the elevation or depth where this happened. The driller’s interpretation and description of the nature of the formation(s) encountered in the drilling. Location and nature of cavities, seams, cracks, whether filled or open, soft or fractured rock and any other relevant information in connection with the purpose of the exploratory drilling. press press press press ready

18 Robit DTH after drilling with air flush
ready Robit DTH after drilling with air flush press

19 Thank You for Your attention!
THE END of Part 75-2A Thank You for Your attention! ready